5
ASSEMBLY INSTRUCTIONS
STEP 1:
Attach the
Front & Rear Stabilizers (No. 3
& 4)
to the
Main Frame (No. 1)
with 4
Carriage Bolts (No. 12)
, 4
Spring
Washers (No. 52)
, 4
Arc Washers (No.
13)
and 4
Acorn Nuts (No. 14).
Tighten
and secure
with
Spanner (No. 99).
STEP 2:
Check the
Tension Controller (No. 17)
is
at Level 8 (highest resistance) to ensure the
cable is the longest. Connect
Extension
Wire (No. 18)
to
Sensor Wire (No. 20)
then
connect
the cable of
Tension Controller
(No. 17)
to the hook of the
Tension Cable
(No. 19)
as shown in
Figure A.
1. Insert eye of upper tension cable into the
cable lock.
2. Pull the tension cable so that you can
insert the cable into the gap at the top of
the metal bracket.
3. Lower the tension cable so that it sits on
the metal bracket.
Remove pre-assembled 6
Inner Hex Bolts
(No. 16)
, 6
Spring Washers (No. 52)
and 6
Arc Washers (No. 13)
from
Main Frame
(No. 1),
then attach the
Handlebar Post
(No. 2)
to the
Main Frame (No. 1)
with 6
Inner Hex Bolts (No. 16)
, 6
Spring
Washers (No. 52)
and 6
Arc Washers (No.
13)
that were removed.
Tighten and secure
with
Wrench (No. 100)
.
NOTE:
Do not completely tighten the bolts
yet.
Summary of Contents for SF-E3607
Page 3: ...2 EXPLODED DIAGRAM ...