9
BATTERY INSTALLATION & REPLACEMENT
BATTERY INSTALLATION:
1. Take out 1 AA battery from meter box.
2. Press the buckle of battery cover on the
Meter (No. 17)
, then remove battery cover.
3. Install 1 AA battery into the battery case on the back of the
Meter (No. 17)
. Pay attention to the
b and
– poles before installing.
4. Press the buckle of battery cover, then put the battery cover back to the back of the
Meter (No.
17)
.
The installation is complete!
BATTERY REPLACEMENT:
1. Press the buckle of battery cover on the back of the
Meter (No. 17)
, then remove battery cover.
2. Remove the 1 old AA battery in the battery case and install 1 new AA battery into the battery
case on the back of the
Meter (No. 17)
. Pay attention to the battery + and
– poles before
installing.
3. Press the buckle of battery cover, then put the battery cover back to the back of the
Meter (No.
17)
.
The replacement is complete!
NOTE:
Dispose battery according to your state and regional guidelines.
Battery
Battery Cover
Summary of Contents for SF-A020052
Page 13: ......