Step.8:
Place small canopy T to small top, and attach Finial M onto the top. (Fig.8)
Step.9:
Attach Beam L to the Connection of Decoration girder K; tighten with Bolts AA and Flat Washer
BB. (Fig.9)
Step.10:
Attach decoration to small peak girder; tighten with bolts AA and flat washer BB. (Fig.10)
Step 11
: Attach Base Cover P to Posts N
ˈ
attach Stake O into Posts N, tighten with Bolts AA and Flat
Washer BB (Fig.11)
Step.12
: Lift the assembled top, attach posts N to the decorative top bar A (B), and tighten with Bolts
AA and Flat Washer BB. (Fig.12)
Step.13:
Attach top end of Supports Q(R) to the decorative top
bar, tighten with Bolts FF and Flat Washer BB, attach lower end
of Supports Q(R) to Posts N, and tighten with Bolts AA and Flat
Washer BB. (Fig.13)
Step.14:
Extend big canopy S, slide Net hooks GG into
decoration slots A (B),
hang the net hooks HH on mosquito net
U to Net hooks GG, (Fig.14)
(11pcs/ Decorative Top Bar )
Step.15:
Tighten Baffle N1 by using Bolts CC and Flat Washer
BB (Fig.15)
Step.16:
Secure the completely assembled Gazebo into the
ground by using the Ground
Stakes II
(Fig.16).