4
Step #1: Bottom Frame Set-up
Before assembly, please do following setup first: Attach the
Plastic Rings for Mosquito Netting (EE) to the Netting Guiders
(D1&D2) and the Big Screen (A) --- 8pcs EE onto D1,5pcs EE
onto D2, and 3pcs EE onto A. Use Plastic Plug (FF) to plug up
the mosquito netting guider to prevent the plastic rings gliding
out
– as shown in the picture on right.
Fig. 1-1 & Fig. 1-2, Screens setup:
Insert the Left Screen (B1) into the
Big Screen (A), pull it down to fix
them; then use AA, CC to secure B1
& A; Do the same for
B2 & A. Don’t
tighten the screws completely at
this time.
Fig. 1-3, Frame setup:
Connect the Long Bar
(C1) and the assembled screens with Screw
(BB) and Washer (CC); Do the same for Short
Bars (C2) and the Screens, until you get the
complete frame setup as shown in Fig. 1.
Don’t tighten any of the screws completely at
this time.
Note:
When aligning Bars C1 and C2, make
sure the holes on it are outside toward.
Fig. 1-4, Attach netting guiders:
Attach the Short
Mosquito Netting Guider (D2) onto the Small Screen
(B1&B2) and the Long Bar (C1); Do the same for Long
Mosquito netting guider (D1) to (B1&B2) and (C2).
Don’t fix
the middle point guider D1 at this time.