background image

 

GG 

Ring 

104 PCS 

 

FF 

8*180 Stake 

12 PCS 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig.6: 

Connect Sloped beam (D) and Sloped beam down pipe (F).

 

Fig.7:

 Attach Sloped beams (D) to Big top connector (L) and then attach Hook (Q) to Big top connector (L). 

Fig.8:

 Connect Sloped beam down pipe (F) and Sloped beam down connector (G) with nuts (CC) and     

      washers (BB). 

Fig.9:

 Attach Middle beams (E1

E2) to Big top connector (L). 

 

 

Fig.13

Attach the assembled Small canopy (S) by inserting the lower side tube of Small top 

sloped beam (K) into the tube of Sloped beam (D).   

Fig.14

Attach the lower end of Arch support 1 (I1) to Post (A) by using bolts (AA) and 

washers (BB) and then attach the upper end of Arch support 1 (I1) to decorative slots.  

Repeat step for Arch support 2 (I2) 

 

Fig.10: 

Insert the lower end of middle beams (E1

E2) into Middle beam down connectors (H1

 

       H2). Then attach the big canopy but do not spread out.

 

Fig.11: 

Attach Small top sloped beams (K) to Small top connector (M). 

Fig.12: 

Attach Small canopy (S) onto the small top and attach 4 corners to Small top sloped   

       beam (K), and then attach Finial (P) to the top. 

 

 

Hardware Pack used in Step 3 

Reviews: