5
BB
M6 Flat washer
28 PCS
AA
M6*15 Bolt
16 PCS
CC
M6 Nut
4 PCS
DD
M6*55 Bolt
8 PCS
Hardware Pack used in Step 2
Fig.1:
Insert the Base cover (N) to the lower side of Post (A) and then attach Base (O) to post (A) by
using bolts (AA) and washers (BB).
Fig.2:
Insert the decorative slots (C1/B1) into the decorative slots (C2/B2), then attach Middle beam
down connectors (H1/H2) to the decorative slots by using bolts (AA) and washers (BB).
Fig.3:
Connect Post (A) with decorative slots together by using bolts (AA) and washers (BB).
Fig.4:
Attach Mosquito netting pipes (J2/J1) to the decorative slots by using bolts (AA) and washers (BB).
Fig.5:
Attach Sloped beam down connector (G) to decorative slots by using bolts (AA) and washers (BB).