background image

 

BB 

M6 Flat washer 

28 PCS 

 

AA 

M6*15 Bolt 

16 PCS 

 

CC 

M6 Nut   

4 PCS 

 

DD 

M6*55 Bolt 

8 PCS 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hardware Pack used in Step 2 

Fig.1:

 Insert the Base cover (N) to the lower side of Post (A) and then attach Base (O) to post (A) by 

using bolts (AA) and washers (BB). 

Fig.2:

 Insert the decorative slots (C1/B1) into the decorative slots (C2/B2), then attach Middle beam   

      

down connectors (H1/H2) to the decorative slots by using bolts (AA) and washers (BB). 

Fig.3:

 Connect Post (A) with decorative slots together by using bolts (AA) and washers (BB). 

Fig.4: 

Attach Mosquito netting pipes (J2/J1) to the decorative slots by using bolts (AA) and washers (BB).

 

Fig.5:

 Attach Sloped beam down connector (G) to decorative slots by using bolts (AA) and washers (BB). 

 

Reviews: