4
/
7
∙
Fig.1-1:Insert across beam 1
(
C
)
into across beam 2
(
D
)
.
Fig.1-2: Attach netting rod
(
I
)
、
middle beam bottom connector
(
G
)
to across beam 1/2
(
C/
D
)
and fix by using bolt (FF)
.
Fig. 2
:
Attach base plate(B) to bottom post
(
A
)
fix by using bolt
(
DD
)
and flat washer
(
CC
)
.
Fig.3:Insert across beam1/2
(
C/D
)
into groove of post
(
A
)
,
then connect across beam 1/2
(
C/D
)
to post
(
A
)
by using bolt
(
EE
)
.
Fig.4: Insert middle beam
(
E
)
、
slanting beam
(
F
)
into big top connector
(
H
)
.
Fig.5
:
Insert big top adjustable tube
(
J
)
inmost hole to middle beam
(
E
)
and slanting beam longer
end
(
F
)
.
Fig.6: Insert small top adjustable tube inmost hole
(
K
)
to slanting beam short end
(
F
)
.
Fig.7
:
Attach slanting beam (F) to Post (A) by using bolt
(
BB
)
、
flat washer
(
CC
)
and Nut
(
DD
)
.
Fig.8
:
Connect middle beam(E) to middle beam bottom connector, by using bolt
(
BB
)
、
Flat washer
(
CC
)
and washer
(
DD
)
.
Country of Origin: China
Fig.1-1
A
B
Fig.1-2
Fig.2
D
C
C
D
G
I
I
FF
CC
DD
CC DD
Fig.6
Fig.3
EE
EE
A
H
F
E
F
E
E/F
J
K
F
F
A
CC
DD
BB
BB
DD
CC
E
G
Fig.4
Fig.5
Fig.7
Fig.8