5
Fig.6:
Fix the corner connector (I ) on the top of the post (A), by using bolt (AA) and washer (BB).
Fig.7:
Fix the pothook (U) onto the big top connector (Q), then insert the big top beam (L), long side beam
(N), short side beam (M) into Big top connector (Q).
Fig.7-1:
Insert the big top beam (L) into the corner connector (I).
Fig.8:
Fix the connector J (K) and beam using the bolt (AA) and washer (BB).
FF
Φ
6X260MM Round nail
TBZ10608260HQ
16 PCS
GG
Plastic ring
88 PCS
Hardware
Used in Step
3
Fig.8-1:
Insert the short and long side beam M (N) into the short and long side connector J (K).
Fig.9:
Insert the small top bar (S) into the small top connector (R). Install the small canopy(V) and tie up the
strap.
Fig.10:
First put the big top canopy (W) onto the top of the gazebo (Do not fully spread), then use bolt (DD),
washer (BB) and nut (EE) to connect small top with corner top bar (L) of big top.