4
Fig.1:
Put the base cover C on the top of post A, then use bolt (AA) and wash (BB) to connect the base (B)
and post A.
Note: Make sure the slots on C and A are at the same side.
Fig.2:
Connect the beam F (D
)
and beam G
(
E
)
, by using the bolt (CC) and washer (BB).
Fig.3:
Attach the connected bar to stand pole (A) by using bolt (CC) and washer (BB) then use bolt (AA) and
washer (BB) to fix the beam and stand pole tightly.
Fig.4:
Fix the mosquito pipe P
(
O
)
onto the beam, use bolt (AA) and washer (BB).
AA
M6X15(Bolt)
TBZ00306015HQ
12 PCS
BB
M6 (Washer)
TBZ10406HQ
16 PCS
DD
M6X35 (Bolt)
TBZ00306035HQ
4 PCS
EE
M6 (Nut)
TBZ20106HQ
4 PCS
Hardware
Used in Step
2
Fig.5, Fig.5-1:
Attach the connecting slice (H)
to the beam and post (A), by using bolt (AA)
and washer (BB).