Transport
It is recommended to lay the DC input cables and AC output cables before moving
the inverter to the installation location.
The inverter can be transported without package nearby its installation site. The unpacked
inverter can be transported by means of forklift, crane, slide rail, or the like.
Forklift
Strictly observe Safety Operation Rules of Forklift during transport.
Fork, put down, and move the inverter slowly and steadily. Place the inverter only on
solid and flat ground.
−
Remove the front and back cover plate at the bottom of the inverter and have the
center of gravity fall in the middle of two forks before starting transport.
The removed cover plates and screws should be properly kept. The cover plates
should be reassembled after mechanical installation.
Pallet truck
Alternatively, use the pallet truck to transport the inverter. In this case, have the center
of gravity of the inverter fall in the middle of two forks of the pallet truck and perform a
test fork.
Fork, put down, and move the inverter slowly and steadily. Place the inverter only on
solid and flat ground.
Observe corresponding safety operation rules during transport.
Crane
The center of the hook should be vertical to the center of the inverter and test hoisting
should be performed. Tilting transport is strictly prohibited. Strictly observe Safety
Operation Rules of Crane during transport.
Hoist, put down, and move the inverter slowly and steadily. Place the inverter only on
solid and flat ground.