Sungrow SG10KTL-MT Quick Manual Download Page 1

 

 

TD_202003_Logger1000_Quick Guide for 3-Phase Inverters_V1.0 

Page 1 of 16 

 

© Sungrow Power Supply Co., Ltd. All rights reserved. 

As we continuously improving our services, changes to this document may occur without notice. 

Connection and Commissioning Quick Guide for 3-

Phase Residential and Commercial Inverters 

 

 

Disclaimer  

The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 

168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a 

statement  or  advice  on  any  of  the  Electrical  or  Solar  Industry  standards  or  guidelines.  Please 

observe all OH&S regulations when working on Sungrow equipment. 

 

Applicability: SG5KTL-MT, SG10 KTL-MT, SG15KTL-M, SG20KTL-M 

 

Notes: 

This quick guide is to be read in conjunction with the Sungrow’s User Manuals and 3 -
phase KTL series inverters as example for demonstration. 

When more than one inverter is installed, all the commissioning is done via the Logger 

1000. 

All of the components are connected via daisy-chain RS485 as per standard RS485 

topology. 

For  export  control  and  load  consumption,  a  3-phase  energy  meter  needs  to  be 

connected. 

Default baud rate is 9600 of the energy meter and this can be changed if necessary, 
by entering “System/Interface/RS485” in the Logger1000. 

Shielded  twisted  pair  with  a  minimum  CSA  of  0.75mm  should  be  used,  and  the 

maximum total length of the cable is 1,200m (120 Ohm resistor should be terminated).  

 

 

 

 

Summary of Contents for SG10KTL-MT

Page 1: ...OH S regulations when working on Sungrow equipment Applicability SG5KTL MT SG10 KTL MT SG15KTL M SG20KTL M Notes This quick guide is to be read in conjunction with the Sungrow s User Manuals and 3 ph...

Page 2: ...2 of 16 Sungrow Power Supply Co Ltd All rights reserved As we continuously improving our services changes to this document may occur without notice Overview Schematic layout of equipment to the logger...

Page 3: ...As we continuously improving our services changes to this document may occur without notice RS485 wiring The RS485 is connected by RJ45 at the inverter end and terminated cable at the logger end Conn...

Page 4: ...may occur without notice Inverter connection to Logger1000 Connect the RS485 comms from the inverter s via A1 B1 and the energy meter via A2 B2 to the Logger1000 On the logger1000 side A1 and B1 are...

Page 5: ...All rights reserved As we continuously improving our services changes to this document may occur without notice If the RS485 is long or if you have communication issues you can connect one of the 120...

Page 6: ...ter to the same RS485 terminals as the inverters Energy Meter Connection For installations where the supply is larger than 80 Amps the site electrician will need to calculate the CT ratio required as...

Page 7: ...cur without notice The corresponding pinouts to RJ45 are Pin 3 White green to RS485 B and Pin 6 Green to RS485 A Terminal 21 to Green cable RS485 A and terminal 22 to White green cable RS485 B on the...

Page 8: ...services changes to this document may occur without notice Logger1000 Commissioning via WLAN Access Logger1000 web portal Use a smart device or laptop under Wi Fi function to search for the SG 10 digi...

Page 9: ...ts reserved As we continuously improving our services changes to this document may occur without notice Then you can log in the account please contact Sungrow for password via the right top corner log...

Page 10: ...d make sure to Save Device list Navigate to Device section and click Auto search the connecting devices will be display under Device List section if connection is correct Sungrow s inverters will be a...

Page 11: ...n the pop up window and fill in the required information Add device for DTSD1352 energy meter and device address 254 If the energy meter s status DTSD1352 is disconnected on the portal please double c...

Page 12: ...served As we continuously improving our services changes to this document may occur without notice How to set the export limit After login the web portal select the Power Control Active Power Then you...

Page 13: ...ervices changes to this document may occur without notice Set up online monitoring The iSolarCloud is available for the Logger1000 online monitoring You need to create an iSolarCloud account first the...

Page 14: ...r s basic information and the plant will be created in a few minutes After you connect the Logger1000 with the customer s router via the ethernet cable you also need to adjust parameter settings on th...

Page 15: ...e maintenance enable the function and make sure the Remote Service Address is selected as International Server Then go to System Transfer Configuration click the Setting gear highlighted in red to cha...

Page 16: ...the above settings are finished you can go back to the Remote Maintenance and check if there is an information indicating the Logger1000 connect with iSolarCloud server Meanwhile you can find a cloud...

Reviews: