15
W
Wiirriin
ng
g S
Stte
ep
pss
Anchor the prepared OT terminal to the grounding hole with M6 x 14 bolt assembly,
where the fastening torque is 7.5±0.5N·m.
IItte
em
m
D
De
effiin
niittiio
on
n
R
Re
em
ma
arrkk
A
M6 x 14 bolt
assembly
Included in the scope of delivery
B
OT terminal
<
-
C
Grounding hole
-
4.4.2 RS485 Communication Terminal Connection
C
Ca
ab
blle
e R
Re
eq
qu
uiirre
em
me
en
nttss
Cables connected to COM100 must be 2 x (0.75–1.5) mm
2
in cross-sectional area.
W
Wiirriin
ng
g S
Stte
ep
pss
step 1
Unscrew the "RS485" waterproof terminal at the bottom of COM100.
step 2
Connect the RS485 cable led from outside to the communication terminal inside
COM100 through the "RS485" communication terminal.
step 3
Strip the cable jacket with a wire stripper.
step 4
Connect the cable to corresponding terminal, and secure it with a screwdriver, where
the fastening torque ranges between 0.5N·m and 0.6N·m.
User Manual
Summary of Contents for COM100
Page 2: ......
Page 8: ...4 2 Function Description User Manual...
Page 13: ...9 E En nd d User Manual 3 Mechanical Installation...