background image

C

CO

OM

M1

10

00

0C

Co

om

mm

mu

un

niic

ca

attiio

on

n B

Bo

oxxU

Usse

err

M

Ma

an

nu

ua

allC

CO

OM

M1

10

00

0--V

V2

22

2--U

UE

EN

N--

V

Ve

err1

11

1--2

20

02

20

00

03

3

COM100-V22-UEN-Ver11-202003

COM100

C

Co

om

mm

mu

un

niic

ca

attiio

on

n B

Bo

oxx

U

Usse

err M

Ma

an

nu

ua

all

Summary of Contents for COM100

Page 1: ...a at tiio on n B Bo ox xU Us se er r M Ma an nu ua allC CO OM M1 10 00 0 V V2 22 2 U UE EN N V Ve er r1 11 1 2 20 02 20 00 03 3 COM100 V22 UEN Ver11 202003 COM100 C Co om mm mu un niic ca at tiio on n...

Page 2: ......

Page 3: ...tallation Method 6 3 3 1 Wall Mounting 6 3 3 2 Ground Mounting 7 3 3 3 Pole Mounting optional 8 4 Electrical Connection 10 4 1 Waterproof Terminal Description 10 4 2 Internal Structure 10 4 3 Preparat...

Page 4: ...II 6 Troubleshooting 24 7 Appendix A Related Parameters 25 8 Appendix B General Information 26 8 1 Quality Guarantee 26 8 2 Contact Information 26...

Page 5: ...eserved including the pictures symbols and markings used in this manual Any reproduction or disclosure even partially of the contents of this manual is strictly prohibited without prior written author...

Page 6: ...tes a hazard with a low level of risk which if not avoided could result in minor or moderate injury NOTICE indicates a situation which if not avoided could result in equipment or property damage NOTE...

Page 7: ...ground mounting available flexible installation S Siim mp plle e a an nd d e ef ff fiic ciie en nt t Seamless connection to iSolarCloud easy management of PV devices Built in PLC communication commun...

Page 8: ...4 2 Function Description User Manual...

Page 9: ...e warranty card delivery inspection report user manual etc 1 C Keys 2 D M10 hexagon bolt assembly used for wall mounted installation and floor mounted installation 4 E M4x25 bolt used for fixing anten...

Page 10: ...ngrow provides the third optional installation method pole mounting If necessary specify your requirement when placing an order Beware of the weight of COM100 throughout the installation process Tilti...

Page 11: ...irmly in place E En nd d 3 3 2 Ground Mounting For the ground mounting the device is fixed via the foundation bolts pre embedded in the foundation step 1 Construct the foundation according to the exte...

Page 12: ...order Sungrow will design according to actual installation conditions Accessories supplied with COM100 include matching screw combinations nuts brackets clamps and the like The installation steps are...

Page 13: ...9 E En nd d User Manual 3 Mechanical Installation...

Page 14: ...erminal C RS485 Waterproof terminals for RS485 communication cables D Input AC 400V 480V 540V 800V Waterproof terminal for PLC communication cables E Input AC220V Waterproof terminal for AC 220V power...

Page 15: ...RS485 communication terminal 2 x 0 75 1 5 mm2 outdoor ultraviolet protection STP Beyond the scope of delivery B PLC1 terminal 4mm 10mm or 7 11AWG withstanding voltage Operating voltage 800V To gourd...

Page 16: ...Max discharge current 20kA I Switch For more information visit the website of the corresponding manufacturer J PLC module K Logger L Grounding terminal 4mm 10mm or 7 11AWG Beyond the scope of delivery...

Page 17: ...100 is designed with two grounding terminals grounding copper bar inside the cabinet and external PE point On site connect both grounding terminals reliably P Pr re ep pa ar ra at tiio on n b be ef fo...

Page 18: ...niit tiio on n R Re em ma ar rk k A M6 bolt assembly It has been installed on the copper bar before delivery B OT terminal C Grounding hole step 3 Secure the cable with M6 bolt where the fastening tor...

Page 19: ...eq qu uiir re em me en nt ts s Cables connected to COM100 must be 2 x 0 75 1 5 mm2 in cross sectional area W Wiir riin ng g S St te ep ps s step 1 Unscrew the RS485 waterproof terminal at the bottom o...

Page 20: ...for reference only and the actual situation may differ N No o C Co om mp po on ne en nt t 1 Pigtail 12 input single mode ST 600mm 2 Jumper Single mode single core ST SC 500mm 3 ST flange 4 Network ca...

Page 21: ...ere the recommended terminal model is LT015008 step 4 Connect the cord end terminal to the corresponding terminal and secure it with screw where the fastening torque is 2 0N m step 5 Screw the waterpr...

Page 22: ...18 f fiig gu ur re e 4 4 1 1 Connection to double winding transformer 4 Electrical Connection User Manual...

Page 23: ...s inside COM100 are all disconnected I In ns st ta alllla at tiio on n S St te ep ps s step 1 Unscrew the waterproof terminal Input AC 400V 480V 540V 800V at the bottom of COM100 and lead external AC...

Page 24: ...20 step 4 Connect the cable to corresponding terminal f fiig gu ur re e 4 4 3 3 Three phase three wire connection 4 Electrical Connection User Manual...

Page 25: ...ansformer side refer to those of the circuit breaker inside COM100 shown in the figure above 4 5 Communication Methods The COM100 can collect the operating data of the inverter transformer and other e...

Page 26: ...ators of Logger3000 If the PWR indicator keeps steady on and the RUN indicator flickers once every second it indicates normal operation C Co on nf fiig gu ur re e L Lo og gg ge er r3 30 00 00 0 t th h...

Page 27: ...nverters manufactured by SUNGROW is normal 9 Create power plants through iSolarCloud App and check whether data displayed on iSolarCloud is normal A Ad dd diit tiio on na all D De es sc cr riip pt tii...

Page 28: ...ce e O Op pe er ra at tiio on n whether corresponding port of the device is set to PLC 4 Master and slave node modules of the PLC are abnormal 4 Check whether the indicator D12 keeps steady red while...

Page 29: ...power supply voltage In built master node of Logger3000 15 Vdc Master node of PLC module 24 Vdc Power consumption Average power consumption 30W Max power consumption 40W Ambient parameter Operating te...

Page 30: ...rsons not from SUNGROW The fault or damage caused by using non standard components or software or using components or software not from SUNGROW The installation and operation do not comply with stipul...

Page 31: ...co Germany Sungrow Deutschland GmbH M nchen 49 89 324 914 761 service germany sungrow co Greece Service Partner Survey Digital 30 2106044212 service greece sungrow co India Sungrow India Private Limi...

Page 32: ...w co Turkey Sungrow Deutschland GmbH Turkey Istanbul Representative Bureau Istanbul 90 2127318883 service turkey sungrow co UK Sungrow Power UK Ltd Milton Keynes 44 0 0908 414127 service uk sungrow co...

Reviews: