Warning:

 

1)

 

When the sunlight is adequate during the installation, you could full fill the glass tube with water and 
then insert into the water tank, try to avoid thermal shock, it may lead to the broken of vacuum tube. 

2)

 

The air vent on the top of water tank needs to keep open. If adopt water supplier, please connect a long 
pipe to the air vent, and the height must higher than the top position of water supplier. 

3)

 

Please pay attention to the weight capacity of roof. 

4)

 

Aerial work, please pay attention to safety. 

5)

 

If you use electric heater, the person who install the electric heater must have electrician qualification. 
And you need to use electricity leakage protection plug and should connect with ground wire. 

6)

 

If you use solar controller, please read the assembly manual of solar controller before you install the 
solar controller. 
 

3.6 Trial operation and troubleshoot methods 

3.6.1 Trial operation. 

First please confirm whether the vacuum tube is shined by sunlight without water inside, otherwise can’t 
feed the cold water. 
Suggestions: If the process has to be finished under sunshine, you can cover the inserted tubes by black 
cloth, etc. 

 

3.6.2 Troubleshoot methods. 

Open the cold water inlet, check the pipe channel and connection between vacuum tube and water tank, if 
find any leakage, it should close the valve immediately, eliminate the leakage. 
As for the leakage when insert the vacuum tube, there are normal four points as follow: 

1)

 

The broken of Silicon ring 

2)

 

There is adsorption bubble on the Silicon ring 

3)

 

Silicon ring is not connected with inner tank 

4)

 

Insert vacuum tubes without any lubricant 

3.6.3 Check the air vent to make sure its fluency. 

 

4. Lightning protection 

The solar water heater should be done lightning protecting to avoid the lightning attacking. The lightning 
rod is necessary which should be 1.5m higher and 3 m far away from the solar water heater. For any 
problems that involve plumbing or electrical connections the services of a qualified professional must be 
employed. 

Warning: When in thunderstorm weather please don't use solar water heaters. 

Summary of Contents for SFD-SS Series

Page 1: ...For our present For their future...

Page 2: ...TION OF SOLAR WATER HEATER 13 3 5 1 Use the water directly after heating exchange through the water tank Suitable for Torrid Zone 13 3 5 2 The connection of solar water heater and Wall mounted gas wat...

Page 3: ...1655 SFD47205818 SS 470mm 20pcs 58mm 1 8M 84KG 1753 1633 1594 1655 SFD47245818 SS 470mm 24pcs 58mm 1 8M 99KG 2077 1957 1594 1655 SFD47305818 SS 470mm 30pcs 58mm 1 8M 118KG 2563 2443 1594 1655 2 How t...

Page 4: ...antity SFD47 5818 SS No Name 15 18 20 24 30 1 Water tank 1 1 1 1 1 2 Gantry 2 2 3 3 3 3 Decoration ring 15 1 18 1 20 1 24 1 30 1 4 Silicon ring 1 1 1 1 1 5 Tube caps 15 1 18 1 20 1 24 1 30 1 6 Diagona...

Page 5: ...collect all the nuts in fear losing one or some Use the pictures on the below to help identify the parts needed for each stage of the assembly Fig 3 1 Fig 3 1 Spec Using a pair of M8 12 bolt connectin...

Page 6: ...g 3 3 Spec Connect crossbar positive haul pole and two sides of pieces with a pair of M8 12 bolt Three legs frame has 3 side pieces and 2 crossbars Connect end seat and front leg with a pair of M8 12...

Page 7: ...traight edge to check the alignment of the tube carriage guides and tube locating holes in the cylinders Gently turn the cylinder to achieve alignment If the holes are not aligned the unit may leak or...

Page 8: ...of the tube carriage guides Now using a gentle downward pressure and twisting motion lower the tube until it fits snugly into the carriage guide Slide the black rubber dust seal up the tube until it...

Page 9: ...9 Subject to change 2011 SUNFLOWER SOLAR Fig 3 7 4 After you insert the opening part of the SFVA tube into the holes of the water tank put the end of the tube into the cup of the frame and make sure t...

Page 10: ...are installed Fig 3 9 Fig 3 9 Spec After inserting the tubes you can rotate the water tank slightly make sure the tubes are in the middle of the hole center Thus you can screw down all the bolts conn...

Page 11: ...http www sunflower solar com Version 11 03 11 Subject to change 2011 SUNFLOWER SOLAR Fig 3 10 Fig 3 10 Spec The picture above is the whole figure...

Page 12: ...lier Fig 3 11 3 4 2 Water Supplier Assembly optional accessory The connector on the bottom of water supplier is connected to the right connector on the water tank of solar water heater The air vent th...

Page 13: ...LAR 3 5 The water inlet and water outlet pipe channel connection of solar water heater 3 5 1 Use the water directly after heating exchange through the water tank Suitable for Torrid Zone Fig 3 11 3 5...

Page 14: ...t to change 2011 SUNFLOWER SOLAR 3 5 3 The connection of solar water heater with gas heating water tank or electrical heating water tank Fig 3 13 3 5 4 The connection of solar water heater with the wa...

Page 15: ...eration First please confirm whether the vacuum tube is shined by sunlight without water inside otherwise can t feed the cold water Suggestions If the process has to be finished under sunshine you can...

Page 16: ...ed at an angle that corresponds to the latitude of the location Installing at an angle less than 20 is not recommended as the heat pipes perform best in the range of 20 70 degree While adhering to thi...

Page 17: ...s are not easily and safely accessible high pressure water spray is also effective 10 2 Leaves During autumn leaves may accumulate between or beneath the tubes Please remove these leaves regularly to...

Reviews: