strona: 9 / 14
3.8.2. Marking and fixing of the mounting brackets
CAUTION!
In order to avoid the risks associated with moving parts of the awnings, device must be
installed at such a height that the lowest moving part will be at least 220 cm from the
ground.
Awning is supplied with brackets for installation in wall, ceiling or roof rafters - in accordance with the
contract.
The awning meets the wind class rating when the manufacturer's recommended number and type of the
mounting brackets were mounted with the correct mounting anchors. Before starting installation make sure
that the mounting surface is suitable for the mounting ‒ if were found the deviations of the surface strength,
then order more mounting brackets - (number of mounting brackets ,in standard, for Wall mounting Concrete
C20/25).
●
Mark the position of the brackets and then drill.
●
Mounting brackets mounted by suitable fasteners. For the base of the concrete C20/25 use of
anchors with a minimum Tension strength of 70 N on the surface of 1 m2.
●
Align the mounting brackets
(A)
to axes and planes.
Note
When selecting the mounting means that the maximum load on the awning at
Windclass1:75N/m² ist; and at Windclass 2:100N/m². In addition, you will be taken into
account the weight of the awning.
3.8.3. Laying electric cables (if motor drive was ordered)
●
Drill out grommet for electrical conduit. Power to the motor drive should be prepared in accordance
with the relevant provisions.