Cabling the System
2-3
2
Figure 2-2
AC Power Sequencer Power Switch and Rear Screen
Replacing the Rear Screen and Kick Panel
1. Tighten the two screws to secure the kick panel to the cabinet.
If cables are to be routed under the floor, the cables should be between the
bottom panel and the kick panel. See Figure 2-3.
2. Place the bottom of the rear screen on the flanges near the cabinet bottom.
3. Tilt the rear screen against the frame and install two screws to secure the
screen in place.
See Figure 2-2.
4. After all the cables are connected and the screen and panel have been
replaced, power on the system.
Rear
screen
AC
power
sequencer
Summary of Contents for Ultra Enterprise 4000 Systems
Page 6: ...vi Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 ...
Page 10: ...x Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 ...
Page 16: ...xvi Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 ...
Page 32: ...1 16 Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 1 ...
Page 64: ...3 18 Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 3 ...
Page 66: ...4 2 Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 4 ...
Page 70: ...Index 4 Ultra Enterprise 6000 5000 4000 Systems Installation Guide November 1996 ...
Page 72: ......