
Chapter 3
Installing the UltraSPARC-II Module
3-11
3.4.3
Turning On the Power
1. Reattach all cords and cables connected to the system unit.
2. Turn on the power in this order:
■
External SCSI peripheral with SCSI terminator attached
■
External SCSI peripheral daisy-chained to the SCSI peripheral with the SCSI
terminator attached
■
Monitor
■
Power On/Standby switch on the system unit back panel.
3. The operating system should load or the
ok
prompt should appear on the monitor.
FIGURE 3-10
Power On/Standby Switch
3.4.4
Power-On Self-Test (POST)
For a full description of the Power-On Self-Test (POST), refer to the Sun Ultra 2
Service Manual.
3.4.5
EnergyStar
If you experience RED State Exception failures when exercising EnergyStar
suspend/resume functions on Solaris 2.5.1 releases prior to Solaris 2.5.1 HW 4/97,
install patch 104729-01.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com