v
Contents
Preface
xix
1.
Getting Started
1–1
1.1
System Requirements
1–2
1.1.1
Connectivity
1–2
1.1.1.1
Hub Connectivity
1–2
1.1.2
Electrical and Environmental
1–2
1.2
Unpacking
1–4
1.3
Handling Switches
1–4
1.4
Connectors
1–5
1.5
Jumper Options
1–5
1.6
Switch and RTM Faceplates
1–6
1.6.1
Base 10/100/1000 Uplink Ports (RJ-45)
1–7
1.6.2
10/100 Management Port (RJ-45)
1–7
1.6.3
Serial Management Port (RJ-45)
1–7
1.7
RTM Airflows
1–7
1.7.1
RTM Airflow Requirements
1–7
1.7.2
RTM Pressure Drop Versus Airflows (Impedence Curves)
1–8
1.8
Removing and Installing Switches
1–10
1.8.1
Removing a Switch Set
1–10
Summary of Contents for Sun Netra CP3240
Page 3: ...Please Recycle ...
Page 4: ......
Page 12: ...xii Sun Netra CP3240 Switch Installation Guide September 2009 ...
Page 14: ...xiv Sun Netra CP3240 Switch Installation Guide September 2009 ...
Page 18: ...xviii Sun Netra CP3240 Switch Installation Guide September 2009 ...
Page 78: ...3 8 Sun Netra CP3240 Switch Installation Guide September 2009 ...
Page 108: ...A 4 Sun Netra CP3240 Switch Installation Guide September 2009 FIGURE A 1 PCB Dimensions ...
Page 129: ...D 6 Sun Netra CP3240 Switch Installation Guide September 2009 ...
Page 131: ...Index 2 Sun Netra CP3240 Switch Installation Guide September 2009 ...