62
Sun Fire V890 Server Rackmounting Guide • May 2004
Before You Begin
Before you begin the installation procedures, complete the following tasks:
■
Verify that your cabinet meets the requirements described in
■
Check
“Safety and System Performance Cautions” on page 62
and make sure your
installation plan reflects the measures described.
■
Check the documentation provided with your cabinet and make sure your
installation plan reflects the cautionary measures described.
■
Unpack the rackmounting kit and verify that you have all the components and
hardware shown in Chapter 1.
■
Gather the required tools. See
“Tools, Equipment, and Documentation Required”
Safety and System Performance
Cautions
Adhere to the following cautions when installing a Sun Fire V890 server into a
cabinet. For a complete description of the safety cautions to follow when installing a
server, see the
Sun Fire V890 Server Owner’s Guide
.
Caution –
Do not open. Qualified Service Personnel Only. Failure to take this
precaution may result in personal injury and system damage
.
Caution –
Do not attempt to lift the server until a qualified service technician
removes all CPU/Memory boards, all power supplies, all CPU fan trays, and all I/O
fan trays. Once these components are removed, four persons are required to lift the
server. See
“Preparing the Server” on page 64
for information about removing these
components.
!