vii
Figures
Rail Assembly (Standard Configuration)
1–3
Spring Clips and Cutouts
1–5
Rail Assembly (Modified for Two-Post Installation)
1–6
Installing the Rails in a Sun Fire Cabinet
1–8
Installing the Rails in a Sun Rack 900 Cabinet or 19-Inch Four-Post Cabinet
1–10
Releasing the Door Hinge Mechanism
1–13
Removing the Shipping Cradle Bolts
1–14
Inserting the Lifting Device into the Shipping Cradle
1–15
Aligning the Slides
1–16
Removing the Shipping Cradle
1–17
Pushing the System into the System Cabinet
1–18
Tightening the Securing Screws
1–18
Inserting and Tightening the Slide Rail Spacers
1–20
Inserting and Tightening the Slide Rail Locking Nut
1–20
Bracket Mounting Holes
1–21
CMA–Lite Cable Management Arm
1–22
Upper/Lower CMA Arms and Left Hand/Right Hand T-Brackets
1–23
Upper/Lower Pivot Bracket Mounting Holes
1–24
Attachment of Upper CMA Arm and Pivot Bracket
1–25
Attachment of Lower CMA Arm and Pivot Bracket
1–26
Summary of Contents for Sun Fire V1280
Page 6: ...vi Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Page 10: ...x Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Page 17: ...Chapter 1 Physical Installation 1 5 FIGURE 1 2 Spring Clips and Cutouts...
Page 64: ...Index 2 Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...