Installation Procedure
23
7. Attach the (black) DC power cables to the lower horizontal connectors J9 and J10
on the front power shelf (
a. Install the outer connectors first then the inner connectors.
b. Route the black cables below the horizontal rail.
8. Attach the straight connector ends of the (red) DC power cables to the upper
horizontal connectors J1 and J2 on the front power shelf (
a. Install the outer connectors first then the inner connectors.
b. Route the red cables above the horizontal rail.
9. Attach the DC power cables from the front option power shelf to the bus box.
Use the criss-cross method described in Step 4.
a. Attach the angled connectors of the red cables to the upper (+) connectors.
b. Attach the straight connectors of the black cables to the lower (-) connectors.
10. Connect two data cables to the front option power shelf.
a. Attach the data cable from the status module tray labeled “B: FRONT J11” to
J11 on the back of the front option power shelf.
b. Attach the data cable from the status module tray labeled “B: FRONT J12” to
J12 on the back of the front option power shelf (
).
11. Install the DC power cables on the remaining rear power shelf before the power
shelf is installed.
a. Attach the (black) DC power cables to the lower horizontal connectors J9 and
J10.
b. Attach the straight connector ends of the (red) DC power cables to the upper
horizontal connectors J1 and J2.
12. Install the rear option power shelf in the chassis.
Make sure that the DC power cables are not crimped or damaged. Do not fasten the
power shelf with screws at this time.
a. Route the black cables below the horizontal rail.
b. Route the red cables above the horizontal rail.
c. Allow the connectors to hang free until the data cables are attached.