9.  Using the supplied Hoist, raise one of the A-Frames.  It does not matter which side raises first. 

10.  Continue using hoist until either the Cross Beam is fully seated in the A-Frame Saddle or until the unit has 

reached a position that allows for easy manual positioning of the A-Frame assembly as shown below. 

11.  When the Cross Beam is firmly seated in the A-

Frame Saddle, lock both casters by setting the 
rolling brake. 

12.  Using a ladder, place two bolts through the A-

Frame and Cross Beam using washers on both 
sides.  Tighten all three bolts to that the connec-
tion is secure. 

CAUTION 
Be certain both casters A-Frame are 
locked before erecting  

13.  Reposition hooks on the Chain Set to the inner 

most hooks. 

14.  Using Hoist, raise second A-Frame and secure in 

the same manner as described above. 

15.  After bolting the Cross Beam to both A-Frames, 

ensuring that all bolts are tight, remove Chain 
Sets and Hoist and place in carrying bag for stor-
age. 

Summary of Contents for GH5T

Page 1: ...ss Park Pershore Worcestershire WR10 2TA UK phone 44 01386 556278 fax 44 01386 556776 NETHERLANDS Midden Engweg 21 NL 3882TS Putten Netherlands europeansales sumner com phone 31 0 85 489 0284 CANADA 7...

Page 2: ......

Page 3: ...11 12 Lift Diagram 12 Maintenance Instructions 13 14 Troubleshooting 14 15 Maintenance Record 16 OWNER S RESPONSIBILITIES Throughout this publication the words WARNING CAUTION and IMPORTANT will be u...

Page 4: ...ver attempt to operate the equipment at more than the recommended capacity 7 No riders on unit This unit was designed for ma terial lifting purposes ONLY and is not designed to function as a personnel...

Page 5: ...leg until the button clicks in place locking the leg in the open position 3 Roll Over the A Frame so that the Support Leg in facing up Pull spring loaded plunger ring and ex tend Support Leg until th...

Page 6: ...trolley onto the opposite end of the cross beam Center trolley on cross beam and tighten with set screws 4 Lift opposite cross beam end and position onto second A frame saddle lining up outside bolt h...

Page 7: ...le lock both casters by setting the rolling brake 12 Using a ladder place two bolts through the A Frame and Cross Beam using washers on both sides Tighten all three bolts to that the connec tion is se...

Page 8: ...slotted keyway in the A Frame 7 Turn the winch handle counter clockwise 1 4 to 1 2 turn to place the weight of the GH5T on the Height Locating Pin CAUTION Be certain to check that lift is level after...

Page 9: ...9 GH5T GANTRY SPECIFICATIONS...

Page 10: ..._____________ Action Date __________________________________________________________________________ Action Date __________________________________________________________________________ Action Date...

Reviews: