background image

 

©  2019 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice. 

www.sunman-energy.com 

version 2019A      page12 / 18 

TM 

SMAxxxM-4X12DW

 

450 

250 

SMAxxxM-4X09DW

 

350 

200 

SMAxxxM-6X12UW

 

450 

250 

SMAxxxM-6X10UW

 

400 

210 

SMAxxxM-4X12UW

 

450 

250 

SMAxxxM-4X09UW

 

350 

200 

 
 

Grounding

 

 

For grounding and bonding requirements, please refer to regional and national safety and  electricity 

standards. If grounding is required, use a recommended connector type for the grounding wire. 

 

For  grounding,  this  guide  refers  to  module  frame  grounding.  If  grounding  is  required,  make  sure 

module frames (metal exposed to touch) are always grounded. 

 

SUNMAN  recommends  always  refer  to  local  state  and  national  code  requirements  for  PV  module 

grounding. SUNMAN highly recommends negative grounding if it's allowed by local authorities. 

 

When  attaching  the  frame  grounding  hardware  and  wire  to  the  frame  it  must  be  placed 

corresponding to the ground symbol stamped location to ensure proper electrical connection. 

 

For grounding should be performed by a qualified electrician. 

For SMD Series 

Grounding layouts 

 

Summary of Contents for eArche PV System

Page 1: ...eArche PV System Installation Manual TM...

Page 2: ...his guide Features Benefits Notices General safety Handling safety Installation safety Fire safety Production Identification Mechanical Installation Grounding Electrical installation Disclaimer of lia...

Page 3: ...on For any questions please contact SUNMAN s Customer Service Department or our local representatives for more detailed information Installers should follow all safety precautions described in this gu...

Page 4: ...sunman energy com version 2019A page2 18 TM Features Benefits Flexible layouts eArcheTM PV system can be installed at any shape roofs which has integrated appearance with buildings Maximization insta...

Page 5: ...equired for eArcheTM PV System PV arrays Copyright and Trademark Information Copyright 2019 by Sunman Zhenjiang Company Limited All rights reserved eArche and the SUNMAN logo are trademarks of Sunman...

Page 6: ...esigned for outdoor use eArche can be ground mounted mounted on rooftops vehicles or boats The proper design of support structures lies within the responsibility of the system designers and installers...

Page 7: ...ensure that the front cover faces down on a soft flat surface to prevent water from collecting inside the panel and causing damage to exposed connectors Installation safety Never open electrical conn...

Page 8: ...pment or in places where flammable gases may be generated eArche have been rated Fire Class C and are suitable for mounting on to a Class A roof Production Identification Each eArche has two labels pr...

Page 9: ...ion any roof penetration required to mount eArche must be properly sealed to prevent leaks Dust building up on the surface of eArche can impair with eArche performance SUNMAN recommends installing eAr...

Page 10: ...teel roofing c Preparation of bonding material Please contact the local distributors for the detail information d Clean the color steel roofing Always keep the backsheet of SMD Series and rooftop clea...

Page 11: ...A page9 18 TM following table eArche SMDxxxM 4X12DW SMDxxxM 4X12UW SMDxxxM 4X09DW SMDxxxM 4X09UW SMDxxxM 6X12DW SMDxxxM 6X12UW SMDxxxM 6X10DW SMDxxxM 6X10UW L 665mm 995mm f Layout of SMD Series Layout...

Page 12: ...llation For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X12UW SMAxxxM 4X09UW Clamps can be used for the connection of SMA series compo...

Page 13: ...ect to change without notice www sunman energy com version 2019A page11 18 TM Layout For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X...

Page 14: ...use a recommended connector type for the grounding wire For grounding this guide refers to module frame grounding If grounding is required make sure module frames metal exposed to touch are always gr...

Page 15: ...Sunman Zhenjiang Co Ltd All rights reserved Specifications included in this manual are subject to change without notice www sunman energy com version 2019A page13 18 TM For SMA Series Grounding layout...

Page 16: ...stainless steel The star washer is fitted directly under the connection terminal and makes electrical contact by penetrating the anodized coating of the aluminum frame see the pictures below Recommend...

Page 17: ...han two strings in parallel if eArche without any fuse or blocking diode to be connected according to the maximum series fuse rating of eArche and local electrical installation code There is no limita...

Page 18: ...herence to this manual and the conditions or methods of installation operation use and maintenance of photovoltaic PV products are beyond SUNMAN s control SUNMAN does not accept responsibility and exp...

Page 19: ...4X09DW 165 18 9 8 74 23 5 9 28 1503mm X 689mm X 5 6mm 3 7kg SMD160M 4X09DW 160 18 6 8 61 23 2 9 17 1503mm X 689mm X 5 6mm 3 7kg SMDxxxM 6X12UW SMD355M 6X12UW 355 39 5 8 99 48 1 9 51 2007mm X 1019mm X...

Page 20: ...mm 5 0kg SMA160M 4X09DW 160 18 6 8 61 23 2 9 17 1479mm X 665mm X 35mm 5 0kg SMAxxxM 6X12UW SMA355M 6X12UW 355 39 5 8 99 48 1 9 51 1983mm X 995mm X 35mm 9 0kg 20A 16 SMA350M 6X12UW 350 39 2 8 93 47 9 9...

Reviews: