Installation
23
Image 7 – Rod kept
inside of bin door
Remove cable from bin and insert rod through bin
wall hole and into torsion bar. See Image 5. Press
down on handle as shown in Image 6 to seal rubber
grommet in hole. If seal is not tight, remove rod and
turn rubber grommet counterclockwise while holding
handle stationary to increase grommet diameter.
Reinsert and check seal again. Repeat as needed.
Affix Cluster Buster operation sticker to inside of bin door near bolt where rod will hang when not in use.
TO OPERATE:
From outside of bin, remove alignment rod and insert 1/4" cable through torsion bar and
conduit. Push cable until it comes into contact with grain over sump.
Attach variable-speed drill to cable and turn drill on. Push spinning cable in and out until clog is broken up
and grain is moving.
NOTE:
If cable does not turn when drill is activated, pull back slightly.
NOTICE:
Before engaging sweep, make sure neither cable nor rod is in torsion bar.
When bin is empty, line up torsion bar with hole in bin wall. Slide rod into torsion bar from outside of bin
and snap down handle to plug hole.
Image 6 – Rod/plug
handle outside of bin
Image 5 – Alignment rod in torsion bar
Table 5 – Cable lengths by
bin diameter
Summary of Contents for U-Trough Power Sweep
Page 3: ...Limited Warranty 3 ...
Page 26: ...Parts Assemblies 26 PARTS ASSEMBLIES COMPLETE U TROUGH ...
Page 28: ...Parts Assemblies 28 U TROUGH BODY ASSEMBLY ...
Page 30: ...Parts Assemblies 30 U TROUGH POWER SWEEP DRIVE HOUSING ...
Page 38: ...Parts Assemblies 38 U TROUGH 20 INCLINE POWERHEAD EU1180 ...