![Sukup Sweepway Owner'S Installation & Operations Manual Download Page 13](http://html1.mh-extra.com/html/sukup/sweepway/sweepway_owners-installation-and-operations-manual_1390130013.webp)
Preparation / Installation
13
Cut hole in bin wall at desired unloading location, with center of hole located as shown in Fig. 4,
depending on size of unload tube.
6” Sweep, cut 6-1/4” U-shaped opening
8” Sweep, cut 8-1/4” U-shaped opening
10” Sweep, cut 10-1/4” U-shaped opening
If floor has not previously been installed, install half of bin floor on side opposite of unload, plus two
planks past center of bin.
NOTE:
Floor planks must run perpendicular to unload tube.
Position center sump so that center of top gearbox is at exact center of bin. Align center sump with bin
wall opening. With spray paint, mark pattern around sump on floor planks. Cut appropriate size hole for
sump. See Fig. 3.
Position center sump so unloading tube attachment points toward bin wall opening. Support center sump
at bottom, if necessary, using non-flammable material. Place extra floor supports around sump for
additional support.
Fig. 5 – Sump installation
Fig. 4 – Bin wall cutout
Summary of Contents for Sweepway
Page 4: ...Limited Warranty 4...
Page 8: ...Safety 8 Safety Decals Placement for Sweepway HORIZONTAL VERTICAL BOOT SWEEP BACKBOARD...
Page 42: ...Parts Assemblies 42 8 10 SWEEPWAY...
Page 48: ...Parts Assemblies 48 HORIZONTAL POWERHEAD MOTOR DRIVE...
Page 52: ...Parts Assemblies 52...
Page 54: ...Parts Assemblies 54...
Page 56: ...Parts Assemblies 56 TOP DRIVE...
Page 58: ...Parts Assemblies 58 25 INCLINE AUGER FOR 6 UNLOAD...
Page 61: ...Parts Assemblies 61 25 INCLINE AUGER FOR 8 UNLOAD E5032 3 belt...
Page 63: ...Parts Assemblies 63 20 INCLINE AUGER FOR 10 UNLOAD E5010 3 belt...
Page 65: ...Parts Assemblies 65 6 SWEEPWAY CENTER SUMP...
Page 67: ...Parts Assemblies 67 8 SWEEPWAY CENTER SUMP...