35  Remove cotter and clevis pins from holes on 1” 

tube coupler attached to gearmotor shaft. Save 

pins

Figure 20

. 

36  Slide 1” tube coupler onto crosstube shaft and 

insert 1/4” x 1-3/4” clevis pin and 1/16” x 3/4” 

cotter pin from step 35 into holes to connect 

crosstube shaft and gearmotor

Figure 20

. 

37  Insert 5/16” x 3/4” bolts and 5/16” lockwashers 

from step 34 through holes in center hanger and 

screw into holes on gearmotor. Check vertical 

alignment. Tighten using 1/2” wrench. 

Figure 20

. 

38  Adjust gearmotor placement so no binding exists 

on pins and center hanger and so pillow block 

and center hanger do not touch tube. DO NOT 

ATTEMPT TO ADJUST gearmotor shaft by 

tapping on shaft with a hammer. 

39  Tighten 4 set screws in pillow block bearing (2 on 

each end) using 1/8” hex (Allen) wrench. Tighten 

bolts (step 33) using 9/16” wrench. Tighten set 

screws on pillowblock. 

Figure 20

. 

40  Screw hanger pipe tightly into 1” threaded hole 

on cast electric junction box. 

 

40.1 

Note:

 Ensure threads are fully engaged, 

as they will hold weight of 

Fastir

.

 

Figure 20

. 

41  Slide cast bushing and brass washer onto hanger 

pipe so they rest on junction box. 

Figure 20

. 

42  Slide end of hanger pipe up through bottom of 

hole in center hanger so junction box is inside 

center hanger. 

Figure 20

Figure 21

. 

Figure 21

 - Placement of Cast Electric Junction Box on 

Center Hanger 

 

42.1 

Note: 

Do not thread rotating contact 

into cast electric junction box until 

machine is raised in bin 

(see page 31 

 

 

for rotating contact instructions).

  

 

Failure to heed this note can result in 

rotating contact binding and breaking. 

43  Slide channel hanger over hanger pipe. 

Figure 

20

Figure 21

. 

44  Screw coupling onto hanger pipe ensuring tab 

on coupling fits in slot on channel hanger. 

Figure 20

Figure 21

. 

45  Thread a liquid-tight elbow (not provided) into 

top of coupling. Ensure threads are seated 

properly and tighten well

Figure 20

. 

46  Bolt chains onto each end of channel hanger 

using 3/8” x 1” bolt and 3/8” nut. Tighten using 

9/16” wrench. 

Figure 20

Figure 22

.  

 

46.1 

Note: 

Center hanger will hang slightly tilted. 

 

 

  This is normal.

 

 

Figure 22

 - Chain Placement in Channel Hanger 

47  Bolt cord hanger to top of center hanger with 5/16” x 

1” bolts. Tighten using 1/2” wrench. 

Figure 23

.

 

Figure 23

 - Cord Hanger Placement on Machine 

47.1 

Fastir Plus Only:

 Bolt cord hanger to 

bottom plate of stationary outside carriage 

using existing 1/2” carriage tightening 

bolts (double nut).

        Figure 24

. 

47.2 

Note:

 Position cord hanger behind 

direction of travel of crosstube to keep 

cords away from augers.

 

 

        Figure 24

 - Cord Hanger Placement on Fastir Plus Unit

 EXISTING 1/2" 

CARRIAGE 

BOLT 

Summary of Contents for Fastir

Page 1: ...555 255th Street Box 677 Sheffield Iowa USA 50475 0677 Phone 641 892 4222 Fax 641 892 4629 Website www sukup com E mail info sukup com DATE REVISIONS PAGES 01 09 2019 Updated warranty 4 01 09 2019 Cha...

Page 2: ...II Installing Rotating Contact 28 XIV Installing Optional Spreader Bar Kit 29 XV Preparing Down Augers 29 XVI Installing Down Augers 30 XVII Final Steps 31 Fastir Operation Guidelines 32 I Operation P...

Page 3: ...es at any time In short our stirring machine is an excellent tool for adding greater flexibility to any bin drying or storage system whether high or low temperature We hope that you return to Sukup fo...

Page 4: ...Limited Warranty 4 LIMITED WARRANTY...

Page 5: ...rds and safety precautions that need to be taken to avoid personal injury or death Always keep children away from bins and vehicles with flowing grain Make no unauthorized modifications to machine Mod...

Page 6: ...on Keep away from all moving parts Keep all shields in place SHUT OFF AND LOCK OUT all power before servicing Failure to follow precautions above could result in death or serious injury CAUTION Metal...

Page 7: ...track 1 3 Ensure hairpin clips are through holes in motor mount 2 Ensure areas of placement for decals are free from grease oil and dirt 3 Mount decals without standing under machine Decal 2 L0271 De...

Page 8: ...A8492 A84922 A8493 A84933 A84935 2 Varies by bin diameter and motor phase and voltage 3 For Fastir Plus units only A3424 A34242 A3424 A34242 A3424 A34242 Table 3 Fastir Fastir Plus Basic Hardware Car...

Page 9: ...5 1 2 Crosstube Safety Decal Package A3399 A3399 1 Parts Sack Stationary Auger Kit A3426 A3426 1 Motor Mount A5209 A5209 1 Outside Stationary Carriage A5250 A6140 1 Shield A8508 A6120 1 Stationary Ca...

Page 10: ...seam Figure 3 Figure 4 A2 Mount 1 length of track with bolts through top holes on track brackets Figure 3 Figure 4 A2 1 Note On bins 30 and larger with a double bracketed track a gap has been left to...

Page 11: ...e of any obstructions that could hinder movement of machine through bin C Installing Track When Holes for Track Brackets Must Be Drilled C1 Place first segment of track in bin C2 Drill holes in top bi...

Page 12: ...Slide primary carriage about 1 foot onto crosstube from inside shaft end Knurled bearing should be on top and slot for down auger on front of crosstube as shown in Figure 7 Figure 8 7 Ensure 1 16 gaps...

Page 13: ...Additional Tie Bar Installation Assembly Installation 13 INSTALLING ADDITIONAL TIE BAR Figure 10 Additional Tie Bar Installation 4 CROSSTUBE FASTIR UPPER TIE BAR...

Page 14: ...allation 14 Figure 11 Primary and Satellite Carriage Assemblies Exploded Views WARNING To prevent death or serious injury be sure that hairpin clips are inserted in motor mount so motor will not fall...

Page 15: ...Assembly Installation 15 Fastir Assembly Figure 12 Tie Bar and Carriage Placement for Fastir Units BACK VIEW TOP VIEW BACK VIEW BACK VIEW BACK VIEW TOP VIEW TOP VIEW TOP VIEW...

Page 16: ...4 81 A8529 102 A59116 66 A5897 18 36 37 1 A8529 102 A59141 93 A85302 112 75 A59121 77 A5897 18 42 42 8 A8532 118 5 A5916 109 A8533 137 5 A59141 93 A59021 27 48 A85333 153 75 A5916 109 A59021 27 49 3 A...

Page 17: ...17 Fastir Plus Assembly Figure 13 Tie Bar and Carriage Placement for Fastir Plus Units TOP VIEW TOP VIEW TOP VIEW BACK VIEW BACK VIEW BACK VIEW PLACE STATIONARY AUGER GUIDE PLATE AGAINST THE WELD OUT...

Page 18: ...A85261 77 A59061 41 A5897 18 30 31 A85260 75 5 A59116 66 A8522 88 A59081 52 A5897 18 33 34 A85383 80 5 A5912 71 A8519 97 A59110 61 A5897 18 36 37 1 A85282 90 5 A59124 81 A85300 106 75 A5912 71 A5897...

Page 19: ...brackets which are supplied by Sukup Manufacturing Co 11 Bolt center support to center hanger using 2 3 8 holes in center hanger Ensure bottom of center support is flush with bottom of center hanger a...

Page 20: ...Bracket Bar Pivot Trolley 1 A45161 13 Shaft Connect Pivot Trolley 1 A45131 01 14 Bracket Weldment Pivot Trolley 1 A45122 15 If your trolley comes pre assembled skip to Step 20 16 Add a 1 2 flatwasher...

Page 21: ...parts referenced in this section see parts assembly manual page 53 26 Slide springs from hardware sack onto each rod on motor mount s Figure 18 Figure 18 Motor Installation 27 Bolt appropriate motor f...

Page 22: ...ure 19 Figure 19 Reversing Plate Installation VII Installing Center Hanger Related Parts For part numbers and descriptions of parts referenced in this section see parts assembly manual page 53 Figure...

Page 23: ...m of hole in center hanger so junction box is inside center hanger Figure 20 Figure 21 Figure 21 Placement of Cast Electric Junction Box on Center Hanger 42 1 Note Do not thread rotating contact into...

Page 24: ...lite carriage closest to bin wall bolt toggle arm from parts sack to top of tab extending beyond carriage shell using a 5 16 shoulder bolt and 1 4 locking nut Ensure toggle arm is parallel with edge o...

Page 25: ...crewdriver 61 1 Note At this point there will be 4 wires from gearmotor and 3 wires from 3 wire cord inside gearmotor junction box 62 Connect loose short white wire with female spade located in plasti...

Page 26: ...ger single phase and 4 and 5 auger units Connect second rotating contact cord plug to plug on cord from appropriate satellite carriage motor Figure 30 page 27 74 Secure rotating contact cord s to cord...

Page 27: ...tallation 27 Fastir and Fastir Plus Cord Connections Figure 30 Motor and Tilt Switch Cord Connection Diagrams Note Above diagrams are for machines with 230V motors 460V units are wired directly and ha...

Page 28: ...e equipment and to the winch drum Always ensure cable is pulling straight off the winch and is not in contact with the frame or drum sides Always prevent cable from rubbing against fixed objects Alway...

Page 29: ...achine Damage to other components as a result of using down augers over 20 will not be the responsibility of Sukup Manufacturing Co Sukup Manufacturing Co makes no warranty express or implied with res...

Page 30: ...ing using 5 16 x 1 3 4 U Bolt and 5 16 nuts and tighten using 1 2 wrench Figure 37 98 Slide the following items over top of each auger shaft in the order below Flange bearing hub up Locking collar for...

Page 31: ...carriage using 1 4 x 1 bolts and tighten using 7 16 wrench 113 For Fastir unit bolt on cord support strap and tie strap cord onto bar of primary carriage For Fastir Plus unit tie strap cord to bars of...

Page 32: ...equipment warranty 5 Use probe to determine moisture content of crop When grain first tests dry on the top grain throughout entire bin may not necessarily be dry Remember the Sukup stirring machine wa...

Page 33: ...ace leads on terminals of capacitor This initial connection will slightly charge capacitor Note A constant reading of zero 0 or infinity indicates a bad capacitor 3 Interchange meter leads Ohmmeter sh...

Page 34: ...ts 1 1 2 HP motor running slow lacking power Wired for 115V or one fuse blown Use voltmeter to determine voltage must be 230V Crosstube not turning Shearpin sheared on gearmotor Replace shearpin Cross...

Page 35: ...imes faster than original rate Raising drying temperature by 40 F 22 C from 70 F 21 C to 110 F 43 C results in drying times 4 3 times faster than were no heat added However drying grain to 8 or 5 mois...

Page 36: ...as that going in usually a couple of days Insufficient cooling of grain will result in moisture condensation and grain spoilage during storage Fans Axial fans are the most common type of fan used for...

Page 37: ...t 120 F 49 C 110 F 43 C Note From North Dakota State University NDSU extension service AE 701 Revised November 1994 Please contact your local extension office for further information regarding your sp...

Page 38: ...eaters are used A becomes primary unit On dual fan and heater units either unit may be primary Air straightener vanes must be included in axial fan or heater to provide proper burner operation and eve...

Page 39: ...ndshield Sukup Airways consist of a system of 10 or 12 triangular perforated tubes attached every 9 along inside of bin sidewall Required number of tubes is four times diameter of bin The main purpose...

Page 40: ...on of fines and trash Grain spreaders help distribute fines Keep area beneath perforated floors clear of all fines and foreign material as they may cause a bin fire For even heat distribution floor su...

Page 41: ...orage time is cut in about half when held at a given moisture content Grain moisture content changes with relative humidity of surrounding air Table 17 shows moisture content of corn at various temper...

Page 42: ...o drying Failure to provide adequate insect control Failure to remove pockets of fines broken kernels weed seeds trash that restrict airflow and provide food for insects and mold Failure to dry grain...

Page 43: ...le foreign material or broken kernels will be more susceptible to mold and insects As a result grain should be cleaned to reduce this hazard or be dried to a moisture content level 1 to 2 lower than c...

Page 44: ...oved aeration After coring top of grain should be visually inspected to ensure an inverted cone has been created as in Figure 48 If no cone is created bridging of grain has occurred and a very unsafe...

Page 45: ...on systems and should always be used in drying Without adequate open area to let air and moisture out of the bin 1 ft 093 m of opening for every 1500 CFM 2550 m hr fan will produce aeration or drying...

Page 46: ...without condensation immediately freezing into ice Frozen chunks block aeration warming cycles and grain unloading Condensation also re wets grain and can cause sudden bin failure and collapse due to...

Page 47: ...ct all panels supporting ribs stairs steps vents and especially all connections to ensure accidents do not occur Ladders Catwalks Supports Ensure access ladders catwalks and platforms are complete and...

Page 48: ...ove all traces of old grain from combines truck beds grain carts augers and any other equipment used for harvesting Remove all rust and apply rust inhibiting primer or paint to affected areas Taking c...

Page 49: ...Appendix A Wiring Diagrams 49 APPENDIX A WIRING DIAGRAMS Figure 51 Single Auger Fastir Wiring Diagram...

Page 50: ...Appendix A Wiring Diagrams 50 Figure 52 Double Auger Fastir Wiring Diagram...

Page 51: ...Appendix A Wiring Diagrams 51 Figure 53 Triple Auger Fastir Wiring Diagram...

Page 52: ...Appendix A Wiring Diagrams 52 Figure 54 Quadruple Auger Fastir Wiring Diagram...

Page 53: ...de reference number Do not order parts by reference numbers If part number cannot be found in manual give clear description of part and its location and function Also specify machine type and size Par...

Page 54: ...Fastir Parts Assembly Manual 54 This page intentionally left blank to more easily reference drawings with parts lists...

Page 55: ...3 4 1 A5711 A5729 36 Dbl Brkt 111 3 16 1 A5712 A5725 37 1 Dbl Brkt 114 3 4 1 A5713 A5729 Bolt Sack Track 36 1 A6815 40 2 42 Dbl Brkt 111 3 8 1 A5714 A5726 Bolt Sack Track 42 1 A6816 48 Dbl Brkt 111 3...

Page 56: ...1 brgs 1 A5649 15 Cast Bushing 1 A5602 Pillow Block w 1 1 4 A5651 16 Cast Electric Junction Box 1 A5612 Center Brg for Pillow Block 1 J0030 17 Junction Box Cover 1 A5658 Center Brg for Pillow Block 1...

Page 57: ...mplete Reversing Plate Assy w hardware 2 A8034 A8049 Reversing Carriage Plate 1 2 plate 4 A80342 A8060 7 Toggle Arm 1 A8505 A8505 8 Reversing Rod 1 Specify machine size Specify machine size 9 Bolt Han...

Page 58: ...Fastir Parts Assembly Manual 58 IV Primary Wrap Around Carriage Figure 58 Primary Wrap Around Carriage Exploded View...

Page 59: ...20 Plug Male 4 Prong Arm 3ph J3725 J3725 Plug Female 4 Prong Arm 3ph J3730 J3730 11 Pulley 2 3 4 x 7 8 A 1 J0295 J0295 12 Key Stock 3 16 sq x 3 4 1 A7522 A7522 13 Center Carriage Shield 1 A8508 A6120...

Page 60: ...Fastir Parts Assembly Manual 60 V Satellite Wrap Around Carriage Figure 59 Satellite Wrap Around Carriage Exploded View...

Page 61: ...Carriage Shield 1 A8508 A6120 16 Plastic Cord Holder 1 A5637 A5637 17 Machine Screw 10 24 1 J0514 J0514 18 Nut 10 24 1 J0985 J0985 19 Tilt Switch Bracket A5449 A5449 20 Tilt Switch 7MPL 46 A5445 A544...

Page 62: ...Fastir Parts Assembly Manual 62 VI Stationary Outside Carriage Fastir Plus Only Figure 60 Stationary Outside Carriage Exploded View...

Page 63: ...Includes Pulley Key 1 A7725 A7725 Motor O 1 1 2hp 230V 3ph Includes Pulley Key 1 A7729 A7729 18 Pulley 2 3 4 x 7 8 A 1 J0295 J0295 19 Key 3 16 sq x 1 A7522 A7522 20 End Carriage Shield 1 A8508 A6120...

Page 64: ...lectric Box 1 A8139 2 Screw 6 32 x 1 4 2 J0455 3 Push Button normally open 1 J4485 4 Bolt 5 16 18 x 1 2 J0527 5 Nut 5 16 18 2 J1002 6 Lockwasher 5 16 2 J1200 7 Tilt Switch w connector 1 5 A5445 8 Moun...

Page 65: ...ews 1 4 x 1 4 2 J1074 7 Pin 2 3 8 long 1 A8044 8 Housing 1 A8042 9 Thrust Bearing 1 J0058 10 Knurled Drive Bearing Replacement for J0057 1 A80691 Complete with Bushings Knurled Bearing 1 A8069 Bushing...

Page 66: ...e Only Dual A5596 A5482 230 Dual 3 7 17 10 10 10 3 Screw 8 18 x PLT S Drill 4 J0460 A5483 230 Dual 3 7 24 10 10 10 4 Cont Bd 1ph w htr 3 term 1 A5563 The following are rotating contacts without cord C...

Page 67: ...15 7B Rotor w shaft 115 220V 1 J3666 8 Gear 1 Large Metal 72 Teeth 1 A5321 9 Cover Field End Bell 1 A5325 10 Screw 10 32 5 J0478 10A Screw 10 32 Painted green for ground 1 J0478 11 Screw 10 32 4 50 PL...

Page 68: ...3PH 1 3PH 1 3 2 1PH 1 6 10 10 20 10 1PH 15 4 31 7 3 3PH 1 3PH 1 3 2 1PH 1 6 10 10 20 10 1PH 15 4 33 8 3 3PH 1 3PH 1 3 2 1PH 1 7 12 10 22 10 1PH 15 4 36 8 3 3PH 1 3PH 1 3 2 1PH 1 7 12 10 22 10 1PH 15...

Page 69: ...69 Fastir Parts Assembly Manual XII Electrical Components Table 34 Electrical Components for Fastir and Fastir Plus Units...

Page 70: ...________ Office Phone ______________________________ Fax _______________________________________ In Case of Emergency Have emergency numbers and written directions to your location near phone and arra...