background image

Ÿ

Construct the frame as in the diagram.

Ÿ

Begin by laying the base poles on the ground (No. 8 and No. 9). Join the base poles 
(No. 8 and No. 9) – they just click together.

Ÿ

Attach the base corner joiners (No.10) and middle base joiners (No. 11) to the base 
poles.

Ÿ

Affix the upright corner poles (No. 1) to the base joiners (No. 10). Then affix the upright 
joiner pole (No. 2) to the middle base joiner No. 11).

Ÿ

Add the top corner and middle joiners (No. 12 and No. 13) to the corner and middle 
poles (No. 1 and No. 2).

Ÿ

Join together the horizontal top poles (No. 3 and No. 4) and then connect these poles 
to the top corner joiners (No. 12) and top middle joiners (No.13).

Ÿ

Join the horizontal middle poles (No. 6 and No. 7) together.

Ÿ

Insert the horizontal middle poles (No. 5, No. 6 and No. 7) into the cavities on the 
upright poles (No. 1 and No. 2).

Ÿ

Y

ou will now have the full frame standing on its own. It will not fall over. 

STEP 1

1

2

3

4

4

4

10

3

3

8

8

1

2

1

1

11

11

12

12

12

12

13

10

10

10

9

9

5

5

5

6

6

7

7

13

3

Super Sukkah 3 x 4m 

Assembly Instructions

Summary of Contents for Super Sukkah

Page 1: ...e your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may collapse upon landing This is especially importa...

Page 2: ...dle x2 Joiner for Top Middle x2 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x3 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 2 Super Sukkah 3 x 4m Assembly Parts Quantity of...

Page 3: ...r and middle joiners No 12 and No 13 to the corner and middle poles No 1 and No 2 Join together the horizontal top poles No 3 and No 4 and then connect these poles to the top corner joiners No 12 and...

Page 4: ...the next vertical pole and slip it through the grooves on the pole Continue around your sukkah and secure it aroundthe last corner pole with the velcro Repeat this forall three straps Note Ensure tha...

Page 5: ...orner x4 Joiner for Top Corner x4 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x1 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 5 Super Sukkah 2 x 3m Assembly Parts Quantity o...

Page 6: ...ase Corner x4 Joiner for Top Corner x4 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x4 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 6 Super Sukkah 3 x 3m Assembly Parts Quant...

Page 7: ...Joiner for Top Middle x2 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x7 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 7 Super Sukkah 3 x 6m Assembly Parts Quantity of items f...

Reviews: