background image

Step 2 

– Insert the first row of panels into the slots

Pic 2

 – 2 slot upright

Pic 1

 – Panel going in

On a 2 meter wall, use a 2-slot 
upright beam between
the two panels

NB:

 Panels are not exactly square.

Make sure you insert the panels
long side up.

5

Summary of Contents for Hard Wall Aluminium 2x3m

Page 1: ...NING Please read before use 3 Wherever you place your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may c...

Page 2: ...ms and panels are different sizes and it is crucial that you use the correct beams and panels in the correct places The beams and panels are marked with colour stickers and it is essential that you fo...

Page 3: ...put these aside for your door Hinge Beams 2 beams joined together with hinges 1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Suk...

Page 4: ...tool to turn the bolt The lock will lock the beam in place To build a 2x3 Sukkah Step 1 Start with the bottom and upright beams first NB Ensure that both sides of the hinges are facing outwards as in...

Page 5: ...st row of panels into the slots Pic 2 2 slot upright Pic 1 Panel going in On a 2 meter wall use a 2 slot upright beam between the two panels NB Panels are not exactly square Make sure you insert the p...

Page 6: ...he red sticker and another 1 meter crossbeam Step 3 Place a crossbeam on top of the panel insert a second panel on top of the crossbeam and close the top off with a 1 or 2 meter crossbeam Leave a gap...

Page 7: ...2m x 3m ARIAL VIEW 5 0 c m 3m 2m Step 6 Place top supports ontop of your Sukkah for added strength Pink Stickers...

Page 8: ...Place a sandbag or heavy item ontop of foot Sandbag over a foot Use Rings to fix to wall or tie down Upright Pole Foot 8 Step 7 Use remaining supports to anchor your sukkah...

Reviews: