Package Contents 

 

 RPT-2018G-2F(-T)-X4 x 1 

 

2 - Wall mounting brackets and screws x 1 

 

3 - Quick installation guide x 1 

 

4 - RJ45 to DB9 Serial Console cable x 1 

 

Safety Precaution 

Attention

 

If the DC voltage is supplied by an external circuit, please use a protection device on the power 

supply input. Supply by UL Listed industrial use power. The industrial Ethernet switch’s hardware 

specs, ports, cabling information, and wiring installation will be described within this user manual. 
 

ATTETNION

 

Si la tension CC est fournie par un circuit externe, veuillez utiliser un dispositif de protection sur 
l'entrée  d'alimentation.  Fourniture  par  courant  industriel  homologué  UL.  Les  spécifications 
matérielles, les ports, les informations de câblage et l'installation du câblage du convertisseur de 
média industriel seront décrits dans ce manuel d'utilisation. 
 

 

Summary of Contents for RPT-2018G-2F-T-X4

Page 1: ...RPT 2018G 2F X4 Series HW User Manual...

Page 2: ...equipment D claration FCC Cet quipement a t test et reconnu conforme aux limites de la classe A pour les quipements num riques conform ment la section 15 des R glementations FCC Ces limites sont con u...

Page 3: ...equired to take adequate measures CE Mark AVERTISSEMENT Ceci est un produit de classe A Dans un environnement domestique ce produit peut tre utilis en pr sence d interf rences radio This document is t...

Page 4: ...2 Hardware Description 3 Physical Dimensions 3 Front Panel 4 Top View 5 LED Indicators 6 Ethernet Ports 7 Cabling 8 Wiring the Power Inputs 9 Mounting Installation 11 DIN Rail Mounting 11 Wall Mountin...

Page 5: ...et any needs for industrial automation application and harsh environments Key Features Interface Performance All Copper ports support auto MDI MDI X function RPT 2018G 2F X4 Embedded 16 10 100 1000Tx...

Page 6: ...trial use power The industrial Ethernet switch s hardware specs ports cabling information and wiring installation will be described within this user manual ATTETNION Si la tension CC est fournie par u...

Page 7: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions 67mm W x 142mm H x 99mm D Figure 2 1 Physical Dimensions...

Page 8: ...w in Figure 2 2 Figure 2 2 The Front Panel LED Indicator Console Port USB Port 100 1000Mbps SFP Link Act LED indicator Port 17 18 100 1000Mbps SFP Port 17 18 Power Connector 10 100 1000TX RJ45 Copper...

Page 9: ...View Figure 2 3 below shows the top panel of the RPT 2018G 2F X4 series switches that is equipped with two 4 pin removal terminal block connector for dual DC power inputs 12 48VDC Figure 2 3 Top Panel...

Page 10: ...Configured event happens MASTER Green On ERPS Owner Mode Ring Master is ready Off ERPS Owner Mode is not active RING Green On ERPS Ring Network is active and works well Off ERPS Ring Network is not a...

Page 11: ...raight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45...

Page 12: ...mplies with IEC 60825 1 and classified as Class 1 laser product Attention Veuillez utiliser un metteur r cepteur optique SFP conforme la norme CEI 60825 1 et class comme produit laser de classe 1 To c...

Page 13: ...Step 1 Press the upper side of the LC connector from the transceiver and pull it out to release as shown below in Figure 2 7 Figure 2 7 Remove LC Connector Step 2 Push down the metal clasp and pull th...

Page 14: ...shown below in Figure 2 9 Figure 2 9 Power Terminal Block Step 2 Tighten the wire clamp screws to prevent the wires from loosening as shown below in Figure 2 10 Figure 2 10 Power Terminal Block Cautio...

Page 15: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Page 16: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Page 17: ...tep 2 Place the wall mounting brackets on the top and bottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the...

Page 18: ...14 Below in Figure 3 5 are the dimensions of the wall mounting bracket Figure 3 5 Wall Mounting Bracket Dimensions...

Page 19: ...to the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Powe...

Page 20: ...sist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indication...

Reviews: