EI-25
EXTERIOR/INTERIOR TRIM
Front Bumper
C: REPAIR
1. COATING METHOD FOR PP BUMPER
Pro-
cess
No.
Process name
Job contents
1
Bumper mounting
Set the bumper on paint worktable if required.
Use paint worktable conforming to inner shape
of bumper when possible.
(1) Bumper
(2) Set bumper section
2
Masking
Mask specified part (black base) with masking tape. Use masking tape for PP (example, Nichiban
No. 533, etc.).
3
Degreasing, clean-
ing
Clean all parts to be painted with white gasoline, normal alcohol, etc. to remove dirt, oil, fat, etc.
4
Primer paint
Apply primer one to all parts to be painted, using air gun. Use primer (clear).
5
Drying
Dry at normal temperature [10 to 15 min. at 20
°
C (68
°
F)].
In half-dried condition, PP primer paint is dissolved by solvent, e.g. thinner, etc.
Therefore, if dust or dirt must be removed, use ordinary alcohol, etc.
6
Top coat paint (I)
Solid color
Metallic color
Use section (block) paint for top coat.
• Paint in use (for each color):
Solid paint
Hardener PB
Thinner T-301
• Mixing ratio:
Main agent vs. hardener = 4:1
• Viscosity: 10 — 13 sec/20
°
C (68
°
F)
• Film thickness: 35 — 45
µ
• Spraying pressure: 245 — 343 kPa
(2.5 — 3.5 kg/cm
2
, 36 — 50 psi)
Use section (block) paint for top coat.
• Paint in use (for each color):
Metallic paint
Hardener PB
Thinner T-306
• Mixing ratio:
Main agent vs. hardener = 10:1
• Viscosity: 10 — 13 sec/20
°
C (68
°
F)
• Film thickness: 15 — 20
µ
• Spraying pressure: 245 — 343 kPa
(2.5 — 3.5 kg/cm
2
, 36 — 50 psi)
7
Drying
Not required.
Dry at normal temperature [10 min. or more at
20
°
C (68
°
F)].
In half-dried condition, avoid dust, dirt.
8
Top coat paint (II)
Not required.
Apply a clear coat to parts with top coat paint
(I), three times, at 5 — 7 minutes intervals.
• Paint in use:
Metallic paint
Hardener PB
Thinner T-301
• Mixing ratio: Clear vs. hardener = 6:1
• Viscosity: 14 — 16 sec/20
°
C (68
°
F)
• Film thickness: 25 — 30
µ
• Spraying pressure: 245 — 343 kPa
(2.5 — 3.5 kg/cm
2
, 36 — 50 psi)
9
Drying
60
°
C (140
°
F), 60 min. or 80
°
C (176
°
F), 30 min.
If higher than 80
°
C (176
°
F), PP may be deformed. Keep maximum temperature of 80
°
C (176
°
F).
10
Inspection
Paint check.
11
Masking removal
Remove the masking in process No. 2.
EI-00038
(1)
(2)
Summary of Contents for 2004 Forester
Page 54: ...AC 52 HVAC SYSTEM HEATER VENTILATOR AND A C General Diagnostics ...
Page 96: ...AC 42 HVAC SYSTEM AUTO A C DIAGNOSTIC General Diagnostic Table ...
Page 306: ...ET 10 ENTERTAINMENT Front Accessory Power Supply Socket ...
Page 312: ...COM 6 COMMUNICATION SYSTEM Horn Switch ...
Page 347: ...BODY STRUCTURE BS Page 1 General Description 2 2 Datum Points 3 3 Datum Dimensions 11 ...
Page 356: ...BS 10 BODY STRUCTURE Datum Points 61 BS 00030 66 62 63 BS 00031 64 BS 00032 ...
Page 380: ...IDI 18 INSTRUMENTATION DRIVER INFO Ambient Sensor ...
Page 381: ...SEAT SE Page 1 General Description 2 2 Front Seat 6 3 Rear Seat 13 ...
Page 436: ...SL 42 SECURITY AND LOCK Keyless Transmitter ...
Page 446: ...SR 10 SUNROOF T TOP CONVERTIBLE TOP SUNROOF Sunroof Switch ...
Page 456: ...EI 10 EXTERIOR INTERIOR TRIM General Description 12 REAR GATE TRIM EI 00012 ...
Page 532: ...CC 14 CRUISE CONTROL SYSTEM Neutral Position Switch MT model ...
Page 571: ...CRUISE CONTROL SYSTEM DIAGNOSTIC CC H4DOTC Page 1 General Description 2 ...