Undercounter Installation
13
subzero.com/specs
Installation Checklist
To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
Has all packing material been removed?
Turn the unit on. Is it operating properly? If not, is the
unit plugged in? Is the control turned on?
Is the power cord plugged into a properly grounded
3-prong outlet, which has been installed in accordance
with all applicable electrical codes?
Has the unit been secured in place with the anti-tip
bracket?
Is the unit level? Are all leveling legs making contact
with the floor?
Is the kickplate installed properly?
Is the water supply connected (model UC-24CI)?
Have you checked for leaks?
Is the door panel attached securely and properly
aligned?
Is the door aligned for proper appearance and
operation?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Has the stainless steel door or panel been inspected
for any imperfections? This is to be done by the dealer
or installer with the customer upon completion of the
installation. Stainless steel panels are covered by a
limited 60-day parts and labor warranty for cosmetic
defects.