background image

Manual of the 

SF35 series Peristaltic Pump Head

4

2.2 Tubing Installation

•  Insert the holder into the tubing,keep the holder sharp corner align with the marking line.Keep the two tubing holders 

parallel with pump head.

•  Put the groove of tubing holders into pump head slideway,press hard until can not be pressed,the tubing holders not install 

in place.

•  Pull the lever clockwise,press slowly until upper block in place,then the tubing holders install in place.

•  Pull the lever anti clockwise 180 degrees, open the upper block.
•  Drawing two marking lines in the tubing,distance is 186mm
•  Put the hose naturally between the roller and the upper block, keep the marking line upward.

Reviews: