Manual of the
SF35 series Peristaltic Pump Head
4
2.2 Tubing Installation
• Insert the holder into the tubing,keep the holder sharp corner align with the marking line.Keep the two tubing holders
parallel with pump head.
• Put the groove of tubing holders into pump head slideway,press hard until can not be pressed,the tubing holders not install
in place.
• Pull the lever clockwise,press slowly until upper block in place,then the tubing holders install in place.
• Pull the lever anti clockwise 180 degrees, open the upper block.
• Drawing two marking lines in the tubing,distance is 186mm
• Put the hose naturally between the roller and the upper block, keep the marking line upward.