WDE
33
© STULZ SpA . – all rights reserved EN/36B/08.2018
INFORMATION
For controller input / output assignation, please refer to the electric diagram on part 2 manual,
specific for each unit.
5. Unpacking and inspection
INSPECTION
STULZ products are delivered ex-works. All units have been individually inspected in all their
components and been carefully packaged before the delivery.
Immediately inspect the unit upon receipt of the goods.
• Make sure that it has been transported in the correct position. Note any unsuitable shipping
conditions on the shipping document.
• Check that no components are missing, that are presents on shipping document and the integrity
of the conditioner at the moment of the receiving.
• Check that there aren’t any external damages. In case of damages, note them on the shipping
document in the presence of deliverer.
• Hidden damage, that are verified after removal the packing, must always be notified to the shipper
by registered letter within 8 days of receipt of the goods.