Stübbe Series MDM 902 Original Operating Manual Download Page 7

Installation and connection

5

Installation and connection

5.1

Preparing for installation

5.1.1

Check operating conditions

1. Ensure the design of the

fi

tting is consistent with the pur-

pose intended:

Materials used (

Type plate).

Medium(

Order and design data).

2. Ensure the required operating conditions are met:

Resistance of the materials of the body, separation
diaphragm and seals to the medium (

Resistance

list).

Media temperature (

Data sheet).

Operating pressure (

Data sheet).

3. Consult with the manufacturer regarding any other use of

the device.

5.1.2

Check the installed condition of the

fi

tting

Check the installed condition of the

fi

tting and depending

on the situation proceed as follows:

Fitting not

fi

lled with the transmitter

fl

uid, pressure

gauge not

fi

tted: Install

fi

tting

(

5.3 Installing the

fi

tting, Page 7 ).

– OR –

Fitting

fi

lled with the transmitter

fl

uid, pressure gauge

fi

tted: Installing

fi

tting in pipe

(

5.4 Installing

fi

tting in

pipe, Page 8 ).

5.2

Planning pipelines

WARNING

Risk of poisoning and environmental damage from
medium.

Leaks due to impermissible pipework forces.

Ensure that the

fi

tting is not subject to any pulling or thrust-

ing forces or bending moments.

1. Plan pipes safely:

No pulling or thrusting forces

No bending moments

Adjust for changes in length due to temperature
changes (compensators, expansion shanks)

Optional

fl

ow direction

Optional installation position and direction

2. Dimensions (

Data sheet).

5.3

Installing the

fi

tting

Before installation in the pipeline, the

fi

tting must be

fi

lled

and the pressure gauge must be

fi

lled and mounted.

Follow the section drawing for assembly

(

9.5 Sectional

drawing, Page 12).

Use the recommended transmitter

fl

uid

(

9.3 Transmitter

fl

uid, Page 12).

5.3.1

Fill the

fi

tting

1. Fill the upper part (2) with transmitter

fl

uid (4), excluding

any air bubbles.

2. Insert the gasket (5) into the upper part (2).

The

fi

tting must be

fi

lled and prepared for assembly to the

pressure gauge.

5.3.2

Installing and

fi

lling the pressure gauge

The

fi

tting must be

fi

lled

The compressed air supply must be available

NOTE

Damage to the separation diaphragm due to lack of trans-
mitter

fl

uid!

Before commissioning, make sure that the

fi

tting is suf

fi

-

ciently

fi

lled with transmitter

fl

uid.

NOTE

Damage to the separation diaphragm due to compressed
air!

Apply compressed air to the

fi

tting only for very short peri-

ods of time. When doing so, do not exceed the permissible
pressure of the pressure gauge that is used.

1. Screw the pressure gauge (1) clockwise into the upper

part (2)

(

9.4 Tightening torques, Page 12).

2. Rotate the

fi

tting until the pressure gauge (1) is facing ver-

tically downwards.

3. Connect the compressed air supply to the bottom sec-

tion (6).

4. Switch on the compressed air supply and apply com-

pressed air to the

fi

tting for short periods of time.

The transmitter

fl

uid is pushed into the pressure gauge.

5. Switch off the compressed air supply and carefully detach

it from the

fi

tting.

6. Rotate the

fi

tting until the pressure gauge (1) is in the

upright position.

7. Unscrew the pressure gauge (1) from the upper part (2).

301 287

BA-2017.09.21 EN

MDM 902

7

Summary of Contents for Series MDM 902

Page 1: ...N Print No 301 287 TR MA DE Rev001 ASV St bbe GmbH Co KG Hollwieser Stra e 5 32602 Vlotho Germany Phone 49 0 5733 799 0 Fax 49 0 5733 799 5000 E mail contact asv stuebbe de Internet www asv stuebbe co...

Page 2: ...fitting 7 5 3 1 Fill the fitting 7 5 3 2 Installing and filling the pressure gauge 7 5 4 Installing fitting in pipe 8 5 4 2 Connection with solvent welding butt weld spigot ends 8 5 4 3 Connection wit...

Page 3: ...other applicable documents especially all safety instructions and warnings 1 2 Other applicable documents To download Resistance lists Resistance of materials used to chemicals www asv stuebbe de pdf_...

Page 4: ...ere the pump is operated Make personal protective equipment available Qualified personnel Make sure all personnel tasked with work on the fitting have read and understood this manual and all other app...

Page 5: ...tting is mounted with the bottom section facing the pressurized pipe carrying the medium The pressure gauge is mounted on the upper part The separation diaphragm transmits the media pressure to the pr...

Page 6: ...erial damage due to inappropriate storage Store the fitting properly 1 Make sure the storage room meets the following condi tions Dry Frost free Vibration free Not in direct sunlight Storage temperatu...

Page 7: ...fitting Before installation in the pipeline the fitting must be filled and the pressure gauge must be filled and mounted Follow the section drawing for assembly 9 5 Sectional drawing Page 12 Use the...

Page 8: ...y be performed by technicians who have been specially trained for the pipework in question NOTE Material damage due to contamination of the fitting Make sure no contamination reaches the fitting Flush...

Page 9: ...e to medium spraying out Use personal protective equipment when carrying out any work on the fitting NOTE Damage to the separation diaphragm due to lack of trans mitter fluid Before commissioning make...

Page 10: ...nal drawing Page 12 ASV St bbe recommends a contact adhesive such as Pat tex Kraftkleber to bond the bottom section to the upper part 1 Unscrew the pressure gauge 1 anti clockwise from the upper part...

Page 11: ...dicated causes Error Possible cause Corrective action Incorrect Measurement value Air bubbles in the transmitter fluid Check that the fitting is sufficiently filled with transmitter fluid top it up if...

Page 12: ...lysantine or Aral Antifreeze Demineralized water Tab 4 Transmitter fluid when used in a potable water area 9 4 Tightening torques Description Torque Pressure gauge hand tight maximal 15 Nm Upper part...

Reviews: