7.11 

Flow Switch Circuit Test:

 

1.  First confirm visually that neither of the flow switch reed clamps have been    

 

 

dislodged during handling or installation.  The clamps must be fully located    

 

 

within their flow switch body grooves as shown.

 

2.  To carry out the following test you will need to obtain a magnet, a typical  

 

 

 

fridge magnet is suitable.

 

3.  Ensure the power supply is switched on.

 

4.  Position the magnet directly in front of a reed clamp as shown.  If pump  

 

 

 

does not start, then slowly move the magnet up and down to a position  

 

 

 

that exceeds the extent of the reed clamp.  The pump should instantaneously  

 

 

start at some point during this extent of movement.  If this does not happen,   

 

 

this indicates a possible fault with the reed switch or the P.C.B which is  

 

 

 

located within the terminal box.  These should be checked electrically.   

 

 

 

Consult Stuart Turner for further instructions.

 

5.  Repeat step 4 with the second reed clamp.

7.12 

Fault Finding:

 The PCB is also fitted with a “power on” indicator light. This will   

 

remain illuminated when mains power is supplied to the board.

 

The indicator light is located on the PCB within the terminal box.

 

z

This operation should only be carried out by a competent    

 person

 

To view the light the following procedure must be followed:-

 

z

Isolate the mains electrical power supply from the pump.

 

z

Remove the four screws retaining the terminal box lid (Fig. 7).

 

z

Lift the terminal box lid off.

Fig. 6

Groove

Body

Reed Clamp

Magnet

Groove

Summary of Contents for mainsboost MBF 60-1-15

Page 1: ...oklet with the owner as it contains important guarantee maintenance and safety information MBF 60 1 15 Pt No 46631 MBF 80 1 15 Pt No 46634 Read this manual carefully before commencing installation Thi...

Page 2: ...and operating instructions in this booklet must be followed z z The pump must not be used for any other application without the written consent of Stuart Turner Limited z z The pump must be installed...

Page 3: ...le free service Failure to install the unit in accordance with the installation instructions will lead to invalidation of the warranty STORAGE If this product is not to be installed immediately on rec...

Page 4: ...uge 2 Flexible hoses 2 Valve strainer check valve combined 1 Pressure regulating valve 1 Adapter G to G 1 A B C D E F Fig 1 IMPORTANT With the pump removed from its packaging check for any damage prio...

Page 5: ...emoved prior to pump installation flux damage will void any warranty 1 15 Pipework design Care should be taken in the design of pipework runs to minimize the risk of air locks e g use drawn bends rath...

Page 6: ...casing can become very hot under normal operating conditions Care must be taken to ensure it cannot be touched during operation 2 15 Water retention Site the pump in a location where in the unlikely e...

Page 7: ...check valve must be fitted c It is advisable to fit a bypass pipe and isolating valves This will allow removal of the pump for maintenance and servicing and ensure the water supply into the property...

Page 8: ...onnection unit should be mounted in an easily accessible position and should be labelled if confusion is possible to allow easy identification of the flomate isolating switch 3 17 Earthing This applia...

Page 9: ...factory pattern is always maintained If the supply cord is to be changed or is damaged it must be replaced with a special cord assembly available from Stuart Turner or one of their approved repairers...

Page 10: ...nce to re fill the vessel ready for next use 4 13 For Further Technical Support Phone the Stuart Turner PumpAssist team on 44 0 800 31 969 80 Our staff are trained to help and advise you over the phon...

Page 11: ...30 litre 40 litre Dry run protection Materials Pump body Brass Impeller Brass Performance Maximum head closed valve 3 2 bar Maximum flow 16 l min Maximum working pressure 450 kPa 4 5 bar Maximum ambie...

Page 12: ...ts Pump runs on when all terminal outlets are closed Leak in system Check tap washers w c valve washers pipe joints Reed clamp out of position Ensure reed clamp is fitted correctly in location groove...

Page 13: ...ng this extent of movement If this does not happen this indicates a possible fault with the reed switch or the P C B which is located within the terminal box These should be checked electrically Consu...

Page 14: ...ternal parts of the terminal box z z Briefly reconnect the mains power supply to the pump the power on light should illuminate if the pump has been correctly wired z z Isolate the mains electrical pow...

Page 15: ...wear and tear and defects which have a negligible effect on the value or operation of the pump Reasonable evidence must be supplied that the product has been purchased within the guarantee term prior...

Page 16: ...roduct launches and access to any special offers or promotions Following initial registration Stuart Turner offers a professional training programme enabling you to achieve Approved Installer status a...

Reviews: