
- 11 -
h) Remove the wire holder from the tank by pulling it through.
DO NOT
allow
for it to fall inside. Repeat steps C - H to fit the second flange in the other
tank.
Step 3 Connecting the tanks:
a) Apply appropriate sealer such as threadlock or PTFE tape to each hose
connector and screw one into each tank connector.
b) Position the paper installation template on the wall alongside the existing unit
where the 200 is to be installed, approximately 262 mm away from
existing tank. Ensure the ‘floor level’ of the template is level and resting on
the surface the iBoost is to be mounted on (Fig. 13).
Fig. 11
Assembled connector
Wire holder
Fig. 12
Tank connector
Hose connector
InstallationTemplate
140
100
480
320
600
100
262
Fig. 13
Mains water supply
Non-pumped water supply
Overflow
Floor
All dimensions in mm
Pumped water supply
(connection only for
200)
Tundish
External
overflow
Template
Previously installed
iBoost 200 unit