![Stryker Triathlon Knee System Surgical Protocol Download Page 11](http://html.mh-extra.com/html/stryker/triathlon-knee-system/triathlon-knee-system_surgical-protocol_1386066011.webp)
Assembly 3
Assembly 4A
Assembly 4B
8
A
s
s
e
m
b
ly
In
s
tr
u
c
ti
o
n
s
Femoral Sizer, Femoral Stylus and Modular
Handle Assembly:
>
Attach the Femoral Stylus to the appropriate
lateral hole of the Femoral Sizer by squeezing the
black tab and inserting into the hole. Release the tab
to lock into place.
>
Press the black button on the Modular Handle
and insert into the holes shown. Release the black
button and turn the Modular Handle until it
clicks into place.
4:1 Cutting Block, Modular Handle, 4:1 Strike
Plate and 4:1 Modular Capture Assembly:
>
Insert the 4:1 Strike Plate into the anterior chamfer of
the 4:1 Cutting Block until it clicks into place.
>
Press the black button on the Modular Handle
and insert it into the hole shown. Release the black
button and turn the Modular Handle until it clicks
into place.
>
To attach the 4:1 Modular Capture, turn the black
“bow-tie” knob and cam to disengage the magnet
from the capture surface.
>
Attach the 4:1 Modular Capture to the anterior or
posterior resection surfaces by positioning it to
straddle the central web.
>
Once fully seated, turn the “bow-tie” knob to engage
the magnet with the captured surface.
Summary of Contents for Triathlon Knee System
Page 2: ......
Page 8: ......
Page 74: ...Notes Triathlon Knee System Surgical Protocol ...
Page 75: ...Notes ...
Page 77: ......