![Stryker 6506 Operation Manual Download Page 57](http://html.mh-extra.com/html/stryker/6506/6506_operation-manual_1385840057.webp)
www.stryker.com
6506-209-001 REV F
51
Operation
Installing the defibrillator platform (Continued)
2.
Open and expand the defibrillator platform legs (
Figure 37 on page 50
).
Figure 36: Stored position
Figure 37: Open defibrillator platform legs
3.
If the product is equipped with an IV pole, raise the IV pole (A) to the up position (
Figure 38 on page 51
).
4.
Place the defibrillator platform on the product frame.
5.
Position the inside legs (B) of the defibrillator platform toward the head end of the product (
Figure 38 on page 51
).
6.
Place the latch hook (C) under the litter frame or foot end fastener and push the tab (D) up until it locks into place
on one side with an audible click. Repeat on the other side. For
Power-LOAD
compatible cots, if equipped, you must
lengthen and attach the straps to the foot end fastener (
Figure 40 on page 52
).
A
B
Figure 38: Raise IV pole and position defibrillator
tray
C
D
Figure 39: Latch hook placement