25
Quasar Owner's Manual
Strong Enterprises
THE DEPLOYMENT BAG
The Quasar deployment bag is constructed of para-pak and contains no velcro
closures to wear out. It utilizes two locking stows and can be fitted with either rubber bands
or ‘Tube Stoes’.
1. After packing your canopy according to its manufacturer’s instructions, S-fold it and place
it into the bag. Ensure that all excess bridle or deflation line is pulled out through the
bag's grommet and the ring located on the canopy is seated against the grommet.
2. Lock the bag closed with two bights of suspension line, then stow the remainder of the
lines across the bottom of the bag.
NOTE: If you have installed a Strong Enterprises collapsible pilot chute, it must now be
“Inflated”. First ensure that the canopy’s bridle attachment ring (or Link) is seated firmly
against the bag’s grommet without capturing any canopy fabric. Now pull the pilot chute
handle away from the bag until all of the deflation line rests inside of the hollow bridle.
Failure to do so may result in a pilot chute in tow malfunction.
CLOSING THE CONTAINER
1. Thread a pull up cord through the main container closing loop.
2. Place the bag into the pack tray with the lines oriented toward the bottom of the container
and route the risers neatly down both sides of the rig and into the pack tray.
3. Lift up on the pull up cord while you rotate the bag downward and seat it firmly into the
container.
4. Close the bottom flap first, and
then the top flap, with the bridle
exiting to the right and temporarily
insert the bridle’s curved ripcord
pin.
Summary of Contents for STELLAR RESERVE Quasar
Page 1: ......