17
Strong Enterprises Owner’s Manual. Para-Cushion
www.strongparachutes.com [email protected]
6.3 Risers Placement
6.3.1
Route risers down backpad and
mate the Velcro®. This will
result in the connector links being
approximately four inches inside
the container.
6.3.2
Right line group will be 14-16”
longer than left line group. Pull
excess line to the container end,
keeping lines even from canopy to
container.