
27
MA_VEB100-1-2-2W-4-5_A3-1_190627_en.doc
3.2
Needle lever
3.2.1
Assembly
A T T E N T I O N !
Switch off the machine electrically!
Remove screw (1), move the Thread take-up lever and remove the needle lever. During
installation, please ensure that the needle runs through the centre of the needle
groove and the needle tip is flush with the left needle guide (Fig. 6).
Fig. 6
Summary of Contents for VEB100-1
Page 4: ......
Page 8: ...4 MA_VEB100 1 2 2W 4 5_A3 1_190627_en doc...
Page 33: ...29 MA_VEB100 1 2 2W 4 5_A3 1_190627_en doc Fig 8...
Page 62: ......