Striem
3100 Brinkerhoff
Kansas City, KS 66115
Tel: 913-222-1500
Fax: 913-291-0457
www.
striemco.com
Made in the U.S.A
Adapter
Adapter
Cover
Cover
Gasket
Gasket
LB-275
(standard)
Upper clamp
Lower clamp
Lower clamp
Upper clamp
Cut location "C"
LR24
(long riser)
(optional component)
Gasket
Upper Clamp
Lower Clamp
Cut location "B"
SR24
(short riser)
(optional component)
Gasket
Lower Clamp
Upper Clamp
LB-35, LB-50,
LB-125 & LB-275
(standard)
Adapter
Cover
Gasket
Upper clamp
Lower clamp
Figure 2
Adapter
Riser
Riser
Distance from step 5
4"
Cut
Mark
Figure 3
Adapter
Riser
exceed 4"*
Must be at least
2-1/2" and cannot
Gasket
Unit
Riser/Adapter
Upper Clamp
Lower Clamp
Figure 4
*3" for a LB-35 with 4" connections
5. Adjust
adapter
upwards to reach 20" to 22"
6. Adjust
adapter
upwards to reach 35" to 37"
Cut location "A"
Adapter
Cover
Adapter & Cover
(standard component)
FLOW
Finished floor
Figure 1
Riser Height
Adapter
Unit
Tools included (with base grease interceptor unit(s))
7/16" Nut driver tool/bit
•
Silver permanent marker
•
Tools Needed:
Tape measure
•
Regular or cordless drill with 1/2" chuck
•
Tools needed if Riser(s) require cutting:
Jigsaw or
•
Cordless circular saw or
•
Reciprocating saw
•
Riser Assembly Instructions/Steps:
If the unit is to be installed on grade (on-the-floor), there is no need for any adjustments.
1.
The unit is ready to be put into service.
2. If the unit is to be buried: Once the unit is set so that the pipe connections line up with
the jobsite piping, measure the total riser height needed from the top of the cover to finished
grade. Make sure you include any future tile work, etc. that may be installed
in your finished grade measurements. See figure 1.
3. Select the according riser(s) needed based off Table 1.
4. If riser(s) are needed, remove the cover(s) from the adapter and remove the adapter from the
main unit by loosening the upper clamp with the included nut driver bit (lower band is factory
set, do not adjust or remove). On the floor near the unit, insert the adapter into the first riser
until it stops. If needed, insert the bottom of the first riser into the top of the second riser until
it stops. You may need to tighten the upper clamps during this step to keep the risers from
shifting. Adapter and riser(s) should sit level with each other. Removal of the cover during this
process will ease assembly.
5. From the top of the adapter, measure your needed total riser height downward to the
sidewall of the riser. Then, add
5”
(for LB-35 or LB-50) or
6”
( for LB-125, or LB-275).
For example, if you have a LB-275 and need a 15-1/2” extension, you would measure
down from the top of the adapter 21-1/2” (15-1/2” + 6” = 21-1/2”). See Figure 2.
6. Refer to Table 2, Table 3 or Table 3a to determine if, and where, any cuts need to be made.
If a cut needs to be made, make a circular line around the sidewall of the riser with the
included silver marker at your riser height
+dimension from step 5
. Using a jigsaw, circular
saw or reciprocating saw, cut along your line. Discard/recycle the cutoff scrap.
7. Whether the riser needs to be cut or not, make another mark with the silver marker on the
sidewall of the riser a distance of
4 INCHES
(3 INCHES for a LB-35 w/ 4” connections) above
the edge just cut. If you did not make a cut (meaning your riser height
+ dimension from
step 5
line was beyond the bottom edge of your riser), still mark the sidewall of the riser
4 INCHES above where your riser height
+ dimension from step 5
line would have been.
DO NOT cut this new line. Once the riser is installed into the main unit, this new line will end
up at the top of the gasket and will aid in re-assembly. See Figure 3.
8. IMPORTANT: Before the next step:
Make sure diffuser is installed inside the main unit at the appropriate location.
9. Refer to sheet 1 of the installation instructions for leak/water testing procedures.
10. Take riser(s) and adapters apart to reduce the weight during installation. Wipe all sidewalls and
inside of gasket with a damp cloth to remove jobsite dust/debris. Install components into the main
unit starting from the lowest (cut) riser and working your way toward the finished floor level. Upper
clamps at each gasket need to be loosened or removed to aid in assembly. Once riser(s)/adapter
is inserted into gasket, upper clamp can be tightened.
11. Verify that the bottom of the lowest riser is protruding at least 2-1/2” but no more than 4” into
the main unit from the top of the gasket. Your mark from step 7 should be at the top edge
of the gasket on the main unit. If measurements were made correctly, this should happen
automatically. See figure 4.
12. If tilting of the adapter is required to be flush with finished grade, it must be done AFTER all
clamps have been tightened with riser(s)/adaptor in a vertical and level position. Tilting is
achieved by using the flexibility of the gasket. If tilting is done before clamps are tightened, a
perfect gasket seal may be compromised. Striem recommends tilting only the adapter versus the
entire riser assembly to make sure your riser height is maintained.
13. Tighten all clamps to a minimum of 5 and a maximum of 8 ft lbs. of torque. Use the same torque
as you would tighten a rubber no-hub coupling.
14. The adapter must be adjusted
upward
to achieve certain extension heights. See Table 2,
Table 3 or Table 3a.
15. If jobsite riser height conditions change after the above steps have been completed, there
may still be room for vertical adjustment in both directions. As long as minimum and maximum
overlaps are maintained (see Figure 4), the adapter/riser(s) can be adjusted/cut as many times
as necessary. Please follow these steps from the beginning to ensure the proper overlaps are
maintained.
1. Adjust
adapter
upwards to reach 22" to 24"
2. Adjust
adapter
upwards to reach 37" to 39"
3. Adjust
adapter
upwards to reach 56" to 58"
4. Adjust
adapter
upwards to reach 70" to 72"
7. Adjust
adapter
upwards to reach 19" to 21"
8. Adjust
adapter
upwards to reach 34" to 36"
TeleGlide Riser (24 Series) Installation Guidelines
(LB-35, LB-50, LB-125, LB-275)
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
LAB BASIN SERIES INSTALLATION,
OPERATION AND MAINTENANCE GUIDE
ECO:
10/22/18
MJ
REV:
DATE:
DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
STRIEM, LLC.
IS
PROHIBITED.
NOTES:
Striem Lab Basins are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
Vent required on outlet pipe only if outlet diptube is present.
SHEET NUMBER:
5 of 6