3
A
8
Remove bung plug and inlet mechanism. Attach 1/2” thread
as shown. Connect flexible hose to bottom of cistern.
B
8
Remove inlet mechanism. Locate the cistern onto the pan.
Screw down
tightly
to ensure a seal between the bolt head
and the bottom of the cistern.
10
Check if the inlet valve is under normal operation and adjust
the inlet valve float adjustment thumbscrew clockwise (for
higher float & water level) or anticlockwise (for lower float &
water level).
Screw inlet hose onto stop tap. Place inlet valve into position
within the cistern.
9
10
Join the inlet mechanism hose
to the thread and replace inlet
mechanism. Connect flexible
hose to stop tap.
Bottom Inlet
Back Inlet
9
Feed hose through hole in pan and locate the cistern onto the
pan. Screw down
tightly
to ensure a seal between the bolt
head and the bottom of the cistern.