OPERATING INSTRUCTIONS
Giga-Trailer
Page 11
3.6 Maintenance – General
Any repair, maintenance, cleaning and conversion work and the clearing of malfunc-
tions is only to be carried out with the drive system switched off, the hydraulic system
depressurised, the electrical system de-energised and the tractor engine stopped!
Remove the ignition key!
Check regularly that nuts and bolts have not loosened and retighten if necessary.
Observe and maintain the correct torque settings!
Check and mount safety guards!
Dispose of oils, greases and filters according to regulations.
Ensure adequate, safe support and stability.
Attention!
If work is being carried out under the hydraulic back panel, the latter must additionally
be protected by the stopcock on the vehicle front panel.
3.7 Road Traffic Regulations for Germany
In the case of exported vehicles, the road traffic regulations in force in the relevant country shall apply.
1. Registration (§ 18)
Trailers running at a speed of over 25 km/h are always subject to registration.
2. TÜV – Re-examination (§ 29)
Trailers with an admissible maximum speed of 40 km/h are subject to this examination by the TÜV every 24
months.
Trailers with an admissible maximum speed of over 40 km/h are subject to this examination every 12 months.
Trailers with an admissible gross weight of over 10 tons must also undergo a safety test every 6 months or, in the
case of vehicles on the road for the first time, starting with the initial test after 24 months.
3. Brakes (§ 41)
The chopper trailer is fitted ex-works with a properly functioning brake system (two-line air brake system). Please
have any readjustment or initial adjustment of brakes done by a renowned brake service centre
870 07 120