Installation of equipment
4.1
-
Foundation requirements
Specification of concrete must be adhered to the specification as following. Failure to do so may result in lift and /or
vehicle falling.
◇
Concrete must be thickness 200mm minimum and without reinforcing steel bars, and must be completely dry
before lift installation.
◇
Concrete must be in good condition and must be of test strength 3500PSI(245kg/cm²)minimum.
◇
Floor must be level with no cracks or holes.
Steps of installation
◇
Location of installation
Check and insure the installation location( concrete, layout, space size etc.) is suitable for lift installation.
◇
Use a carpenter's chalk line to establish installation layout of baseplate.