background image

 

7

 

3

-

Installation steps

 

Step 1:Check the pats before assembly

 

Packaged

 

lift

 

and

 

hydraulic

 

power

 

unit( See

 

Fig 5

 

)

 

Step 2:Move aside the parts and check the parts according to the shipment parts list (See Fig 6).

 

FIG 5

 

FIG 6

 

Summary of Contents for SAE-C12X

Page 1: ...ructions Model No SAE C12X 2 Post Overhead Lift Single 1 Point Manual Release Lifting Capacity 12000LBS Important Note 1 This equipment can not be installed operated or repaired without reading instru...

Page 2: ...t Reminder 18 5 2 Vehicle Position 19 5 3 Risk of Vehicle falling off from the lift 19 6 Maintenance 19 6 1 Every Month 19 6 2 Every 3 Month 19 6 3 Every 6 Month 20 6 4 Every 12 Moth 20 7 Troubleshoot...

Page 3: ...fting height 74 13 16 1900mm Min height 4 5 8 118mm Column inside 129 15 16 3300mm Drive through 115 11 16 2939mm Lifting time About 60 sec Lowering Time About 40 sec Column thickness of steel 6 0mm C...

Page 4: ...4 Installation See Fig 1 FIG 1 Features See Fig 2 FIG 2...

Page 5: ...required Name Picture Rotary hammer drill 19 carpenter s chalk Hammer Screw Sets Level bar Tap measure English spanner 12 Pliers Ratchet spanner with socket 28 Socket head wrench 3 5 8 Lock wrench Wr...

Page 6: ...eel bars and must be completely dry before lift installation Concrete must be in good condition and must be of test strength 3500psi 245kg cm minimum Floor must be level with no cracks or holes Steps...

Page 7: ...allation steps Step 1 Check the pats before assembly Packaged lift and hydraulic power unit See Fig 5 Step 2 Move aside the parts and check the parts according to the shipment parts list See Fig 6 FIG...

Page 8: ...eightening sleeve bracket fixing screw Hexagon socket screws M8 10L 2 7 Anti collision tape 2 8 Anti collision rubber strip fixing screws Hexagon socket screws M8 30 4 9 Power unit frame 1 10 Power un...

Page 9: ...d fixing screws Hexagon Screw M10 25L Each 8 25 Heightening section and column connecting screw Hexagon socket screws M10 12L Each 16 26 Wire rope support frame at the upper end of the heightening sec...

Page 10: ...n layout of baseplate Install the anchor bolts Check the columns plumbness with level bar and adjusting with the shims if the columns are not vertical Do not tighten the anchor bolts See Fig 7 Note An...

Page 11: ...e Qty 1 Main column heightening section 1 2 Main column welding 1 3 Socket head cap screws M10 12 10 4 Flat pad 10 No Name Qty 1 Main cross arm assembly 1 2 Assembly of auxiliary crossarm 1 3 Hex bolt...

Page 12: ...Name Qty 1 Main column heightening section 1 2 Main cross arm assembly 1 3 Hex bolts M10 25 4 4 Flat pad 10 4 5 Spring cushion 10 4 6 Hex nuts 4 No Name Qty 1 Main column heightening section 1 2 Secon...

Page 13: ...rope 1 3 Unlock the sheave seat 1 4 Safety lock cover Opening 1 5 Unlock lever 1 6 Phillips round head screw M6 10 4 No Name Qty 1 Sub column assembly 1 2 Unlock the thin wire rope 1 3 Unlock the she...

Page 14: ...engaged before attempting to route cables 4 After the cable being fixed adjust and make the cable at both sides be with the same tightness which could be judged by the sound emitted during lifting pro...

Page 15: ...g 15 Important Information Pressure Valve Clockwise adjustment increases pressure to make the power unit to have more power counterclockwise adjustment decreases pressure to make the power unit to hav...

Page 16: ...by the viscosity of the hydraulic oil we suggest using NO 46 hydraulic oil when average temperature of the location is above 18 degree Celsius and using NO 32 hydraulic oil when temperature is below 1...

Page 17: ...fter After bleeding oil level in power unit reservoir may be down Raise and lower lift several cycles Add more oil if necessary to raise lift to full height It is only necessary to add oil to raise li...

Page 18: ...Lowering The safety lock must be released before lowering 1 Press the power switch to raise the car by approximately 30mm 1 2 2 Pull the safety lock release cables on both sides to unlock 3 Press the...

Page 19: ...on the vehicle or the lift when the lift is raised Below actions may cause the vehicle fall off from the lift Fig 21 Fig 21DO TOT do FIG 20 6 Maintenance 6 1 Every Month Hydraulic System 1 Check hydra...

Page 20: ...ring Dump valve failure Replace the dump valve Hydraulic oil leaks Check and repair The valve body of the power unit has holes Replace the valve body Raise without load but doesn t raise with load The...

Page 21: ...t 1 2 Block assembly 1 6 Power unit backpack 1 3 Heightening bracket 1 7 Main column heightening section 1 4 Cylinder assembly 1 8 Unlock the rope bracket 1 No Name Qty No Name Qty 1 Sub column assemb...

Page 22: ...indrical pin 6 22 2 10 Elastic cylindrical pin 6 50 2 11 Square tooth 2 12 Square gear shaft cushion cover 2 No Name Qty No Name Qty 1 Beam 1 1 8 Elastic washer for shaft 20 2 2 Beam 2 1 9 Beam axis 1...

Page 23: ...ng 1 9 Moon teeth 1 4 Flat head hexagon socket screw M8 16 1 10 Flat pad 10 3 5 Round rubber pad 1 11 Spring cushion 10 3 6 Pallet welding 1 12 Hex bolts M10 30 3 No Name Qty No Name Qty 1 Welding of...

Page 24: ...1 4 Unlock lever 1 15 Socket head cap screws M6 10 1 5 Handball 1 16 Flat pad 6 1 6 Hexagon nut M10 1 17 Elastic cylindrical pin 6 30 1 7 Unlock the handle seat 1 18 Security lock spacer 1 8 Unlock t...

Page 25: ...he handle seat 1 3 Unlock the sheave shaft 1 12 Security lock spacer 1 4 Unlock the sheave 1 13 Socket head cap screws M6 10 1 5 Safety tip lock 1 14 Flat pad 6 1 6 Safety lock shaft 1 15 Circlip 20 2...

Page 26: ...26...

Reviews: