Stratasys Fortus 250mc Site Preparation Manual Download Page 11

7

RECEIVING THE PRINTER

INSPECT CRATE FOR DAMAGE

Before opening the shipping crate, inspect the crate for signs of exterior damage.

Report evidence of excessive damage to Stratasys and the shipping company.

PREPARING FOR INSTALLATION

REQUIRED TOOLS AND EQUIPMENT

• 

Basic hand tools (powered screwdriver or drill with Phillips bit).

• 

A pallet jack or forklift will be needed to move the system.

UNPACKING THE PRINTER

The work area for unpacking the system should be 2.8 m (104 in.) high, 2.2 m (86 in.) wide and 1.9 m (76 in.) 
deep.

For detailed unpacking and setup instructions, refer to Chapter 3 of the Fortus 250mc User Guide. 

SITE PREPARATION CHECKLIST

ELECTRICAL INSTALLATION REQUIREMENTS 

 

A dedicated outlet of 100-240V ~15-7A 50/60 Hz 1200W has been installed.

 

The grounded electrical outlet is within 2 meters (80 inches) of the printer.

 

The grounded electrical outlet is able to accept either a Euro or US power cord plug. 

ENVIRONMENTAL REQUIREMENTS

 

The site’s environmental temperature is between 59°F to 86°F (15°C to 30°C).

 

The site’s environmental humidity is between 30% to 70%, non-condensing.

Summary of Contents for Fortus 250mc

Page 1: ...Part No 400713 0001_REV_A Fortus 250mc SITE PREPARATION GUIDE...

Page 2: ...th Stratasys per software copyright No part of this document may be photocopied reproduced or translated into another language without the prior written consent of Stratasys Inc All drawings and infor...

Page 3: ...tion 3 WORKSTATION REQUIREMENTS 3 ELECTRICAL REQUIREMENTS 3 AC Power Requirements 3 LAN REQUIREMENTS 3 UNINTERRUPTIBLE POWER SUPPLY UPS 4 USE AND INSTALLATION 4 GENERAL INFORMATION 4 Parts List Cable...

Page 4: ...the ground lead Know the location of equipment branch circuit interrupters or circuit breakers and how to turn them on and off in case of emergency Know the location of fire extinguishers and how to...

Page 5: ...1 model 1 support User Interface with Display Panel and Keypad HOW TO USE THIS GUIDE This guide provides information for selecting an appropriate location for the Fortus 250mc Information of particula...

Page 6: ...Air quality conditions with excessive solid particulates conductive or non conductive may result in system damage Air quality conditions in which airborne oils are allowed to accumulate on or within...

Page 7: ...A LAN connection is required for communication and file transfer functions The LAN connection is a 100 base T Ethernet protocol RJ45 connector One CAT5 10 100 base T cable is supplied with the printe...

Page 8: ...nd I O Module if used Installation and Operation Guides for instructions on installing the I O module if used into the UPS unit as well as for connecting AC power to the UPS and Fortus system While co...

Page 9: ...sg Plug 9Pos AMP 205204 9 2 2 Pin Male 24 20 AWG AMP 1 66506 0 3 1 Shell Size 1 9 Pin w Grommets AMP 748677 1 4 2 Jackscrew Pair 4 40 Knurled AMP 747784 3 5 XX x Cable 2 Conductor 22 AWG ALPHA 1172C o...

Page 10: ...6 Figure 2 UPS Cable Diagram...

Page 11: ...e system should be 2 8 m 104 in high 2 2 m 86 in wide and 1 9 m 76 in deep For detailed unpacking and setup instructions refer to Chapter 3 of the Fortus 250mc User Guide SITE PREPARATION CHECKLIST EL...

Page 12: ...aterials and applications call 888 480 3548 or visit www stratasys com DOCUMENTATION FEEDBACK Customers resellers and Stratasys employees are encouraged to send comments about our documentation and tr...

Reviews: