background image

 

 

Figure 4 

3.

 

After finishing installing the first two groups of peak arches, connect the Connection Tube (part 
code 5) and Supporting tube for roof frame (Part No 6) onto them by using Bolt M10x80mm 

part code 14

. Then install the third group into base plate and connect the connection tubes, 

there are 5 groups of peak arches and 5 pieces of connection tubes between each two groups. Finally 

install the Diagonal Bracing Tube (part code 19) using Clip

part code 19A

as Figure No 

2. By turns the assembly of the main frame is finished. 

C--END DOORS ATTACHED 

 

 

Figure 5 

Door frame: Connect all the tube for door frame and fix them by using right bolts. 
Put on the front and back covers (Part No. 12) refer to the Figure 5 and knit the cover by using 
rope (No.16). 

D- Install the Roof Cover 

Summary of Contents for Two Car Garage Shelter

Page 1: ...SHELTER ASSEMBLY MANUAL Two Car Garage Shelter...

Page 2: ...g tube for roof frame 5 7 Base Plate 4 8 Base Plate at middle 6 8A Ratchet 10 9 Tension tube 2 10 Stake peg 20 11 Roof cover 1 12 Front and back cover 2 13 bolt 8 70mm 80 14 bolt 10 80mm 25 15 bolt 8...

Page 3: ...ility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery pla...

Page 4: ...place the base plates UNIT m Figure 1 1 The measure is from center to center of the tubes Referring to the above diagram and confirm the place of the base plates ENSURE THAT THE FOUNDATIONS IS SQUARE...

Page 5: ...Model 222411P Frame Figure 2 Size W22 x L24 x H11...

Page 6: ...be Part No 4 To connect them by using Bolt M8x70 part code 13 which makes one group of peak arch Please NOTE the direction of the screw DO NOT install the bolts on the top of the truss where the fabri...

Page 7: ...s there are 5 groups of peak arches and 5 pieces of connection tubes between each two groups Finally install the Diagonal Bracing Tube part code 19 using Clip part code 19A as Figure No 2 By turns the...

Page 8: ...ope part code 21 to knit the cover on the two sides of the peak arches through all the holes 3 Cut 3 pockets according to the position of the base plates and insert the Lower Tension Tubes part code 9...

Page 9: ...Figure 7 The process is quite easy But some tightening adjustments will be necessary to produce a flat tension roof cover Please adjust the roof cover every month or windy day...

Reviews: