YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years
of reliable service. These instructions include helpful hints and important information needed to safely assemble
and properly maintain the shelter. Please read these instructions

before

you begin.

If you have any questions during the assembly, please contact local dealer for assistance.

SAFETY PRECAUTIONS

. Wear eye protection.
. Wear head protection
. Wear gloves when handling metal tubes
. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords.
. Do not climb on the shelter or framing during or after construction.
. Do not occupy the shelter during high winds, tornadoes, or hurricanes.
. Provide adequate ventilation if the structure is enclosed.
. Do not store hazardous materials in the shelter.
. Provide proper ingress and egress to prevent entrapment.

ANCHORING INSTRUCTIONS

Prior to assembling this shelter, please read the

MUST READ

document included with the shipment.

WARNING:

The anchor assembly is an integral part of the shelter construction. Improper anchoring may

cause shelter instability and failure of the structure. Failing to anchor the shelter properly

will void the

manufacturer’s warranty

and may cause serious injury and damage.

LOCATION

Choosing the proper location is an important step before you begin to assemble the structure.
The following suggestions and precautions will help you determine whether your selected location is the best
location.
. Never erect the structure under power lines.
. Identify whether underground cables and pipes are present

before

preparing the site or anchoring the

structure.
. Location should be away from structures that could cause snow to drift on or around the building
. Do not position the shelter where large loads such as snow and ice, large tree branches, or other overhead
obstacles could fall.
. Your shelter’s cover can be quickly removed and stored prior to severe weather conditions. If strong winds or
severe weather is forecast in your area, we recommend removal of cover.

SITE

After choosing a location, proper preparation of the site is essential. The following site characteristics will help
ensure the integrity of the structure.
. The support structure must be level to properly and safely erect and anchor the frame.
. Drainage: Water draining off the structure and from areas surrounding the site should drain away from the site
to prevent damage to the site, the structure, and contents of the structure.

WARNING:

The individuals assembling this structure are responsible for designing and furnishing all

temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are
not familiar with recognized construction methods and techniques

must seek the help of a qualified contractor.

Summary of Contents for FB406021DP

Page 1: ...1 Fabric Building Double Truss Peak Style Model FB406021DP 40 x60 x21 10 arch space Assembly Instructions...

Page 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...

Page 3: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...

Page 4: ...h arch 2 B 2 roof truss for 2nd to 6th arch 10 B 2A roof truss for 1st and 7th arch 4 B 3 lower roof truss for 2nd to 6th arch 10 A 3A lower roof truss for 1st and 7th arch 4 A 4 shoulder truss for 2n...

Page 5: ...11 tube clip for steel wire No 22 48 B 12 bolt M8x70 for truss swaged end connection 280 B 13 bolt M10x70 for purlin connection 63 B 14 end plug 40 for tensioning tube No 8 4 B 15 belt for ratchet on...

Page 6: ...ht side of the front and back door 2 A 27 connection plate for square tube post No 23 24 25 26 4 4 B 28 interior lower post 4 A 29 interior upper post 4 A 30 base plate for front and back wall 4 A 31...

Page 7: ...r door bracing tube No 40 No 41 8 B 45 bolt M12x130 for square tube post No 23 24 25 26 20 B 46 bolt M10x70 for square tube post No 23 24 25 26 18 B 47 rope for front and back cover 6 bundles 2 packs...

Page 8: ...gram to mark the position of base plate The measurement is from center to center of base plates Referring to the diagram and confirm the place of base plates ENSURE THAT THE FOUNDATION IS SQUARE Note...

Page 9: ...Arch and Front Back Wall 1 Find Trusses No 1A 2A 3A 4A 5 for first and seventh arch and connect them by bolt M8x70 No 12 2 Find relative parts of posts and rails for front and back wall and assemble...

Page 10: ...10 Second Arch to Sixth Arch Installation 3 Find Trusses No 1 2 3 4 5 for second to sixth arch and connect them by bolt M8x70 No 12...

Page 11: ...econd arches install purlin No 6 and connect them by bolt M10x70 No 13 Then the third arch and purlins In this turn one arch and then purlin tubes until the seventh arch 6 Install steel wires No 22 be...

Page 12: ...12 C INSTALLING COVER Front Back Cover and Winch Door Installation Install the winch door refer to the diagram bellow Winch Door Installation...

Page 13: ...13 1 Install the front door frame and door winch bracket 2 Fix the winch to the bracket Make sure the winch handle faces the outside Refer to Figure 1...

Page 14: ...ection The side with pipe pockets faces inward 4 Connect the door bracing tube 2pcs set with M6x40 bolt 5 Thread the door bracing tube into the pocket from top to bottom Pay attention to the bottom br...

Page 15: ...rame and on the same plane as the pulley and then the steel wire rope sags naturally Keep the length of both sides equal and naturally sag to the ground 7 Fix each end of steel wire rope to the hole o...

Page 16: ...16 9 Adjust the length of the steel wire rope to be equal on both sides Fix the wire rope fold to the hole in the winch Refer to Figure 4 4...

Page 17: ...10 Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about 40 50cm away from the cross beam Lace the eyelets on the cloth to cross beam with a rope Refer to Figur...

Page 18: ...he winch door installation is completed Turn the winch clockwise to raise and counterclockwise to lower the door The steel wire rope shall be evenly wound on the winch so that the door can rise and fa...

Page 19: ...e sure doing not over pull the end of roof cover 2 Pull the roof cover over frame EVENLY CAREFULLY AND SLOWLY Insert tensioning tube No 8 into the pipe pockets Cut a small opening over against every b...

Page 20: ...20 Now your assembly is completed...

Reviews: