background image

19

Front & back Cover Installation

Install front & back cover (No.53) to the first and seventh arch and posts and rails on front and back

wall with rope (No.47) and cable tie (No.48).

Roof Cover Installation

NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze

is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over

the arches with the breeze blowing in the cover like a sail filled with air.

1. Roll out the roof cover on a ground sheet. Align the cover evenly to each end of the frame. Be sure

doing not over pull the end of roof cover.

2. Pull the roof cover over frame EVENLY, CAREFULLY AND SLOWLY. Insert tensioning tube (No.8) into

the pipe pockets. Cut a small opening over against every base plate. Put the belt (No.15) around

tensioning tube and go through ratchet on base plate and loosely secure. DO NOT TIGHTEN. Adjust

the cover so that it is square and evenly centered on the frame.

Note: The end flaps must overhang evenly at both ends.

3. Use Rope (No.16) to tighten roof cover to end arches.

4. When roof cover is tidy and ready, drive the ratchet tie down forth and back and then roof cover is

tightened in the vertical direction.

5. Tidy the cover. Pull the strap inside the end of roof cover, make the cover well fold to end arches

and fasten the strap with ratchet.

Summary of Contents for FB406021DP

Page 1: ...1 Fabric Building Double Truss Peak Style Model FB406021DP 40 x60 x21 10 arch space Assembly Instructions...

Page 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...

Page 3: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...

Page 4: ...h arch 2 B 2 roof truss for 2nd to 6th arch 10 B 2A roof truss for 1st and 7th arch 4 B 3 lower roof truss for 2nd to 6th arch 10 A 3A lower roof truss for 1st and 7th arch 4 A 4 shoulder truss for 2n...

Page 5: ...11 tube clip for steel wire No 22 48 B 12 bolt M8x70 for truss swaged end connection 280 B 13 bolt M10x70 for purlin connection 63 B 14 end plug 40 for tensioning tube No 8 4 B 15 belt for ratchet on...

Page 6: ...ht side of the front and back door 2 A 27 connection plate for square tube post No 23 24 25 26 4 4 B 28 interior lower post 4 A 29 interior upper post 4 A 30 base plate for front and back wall 4 A 31...

Page 7: ...r door bracing tube No 40 No 41 8 B 45 bolt M12x130 for square tube post No 23 24 25 26 20 B 46 bolt M10x70 for square tube post No 23 24 25 26 18 B 47 rope for front and back cover 6 bundles 2 packs...

Page 8: ...gram to mark the position of base plate The measurement is from center to center of base plates Referring to the diagram and confirm the place of base plates ENSURE THAT THE FOUNDATION IS SQUARE Note...

Page 9: ...Arch and Front Back Wall 1 Find Trusses No 1A 2A 3A 4A 5 for first and seventh arch and connect them by bolt M8x70 No 12 2 Find relative parts of posts and rails for front and back wall and assemble...

Page 10: ...10 Second Arch to Sixth Arch Installation 3 Find Trusses No 1 2 3 4 5 for second to sixth arch and connect them by bolt M8x70 No 12...

Page 11: ...econd arches install purlin No 6 and connect them by bolt M10x70 No 13 Then the third arch and purlins In this turn one arch and then purlin tubes until the seventh arch 6 Install steel wires No 22 be...

Page 12: ...12 C INSTALLING COVER Front Back Cover and Winch Door Installation Install the winch door refer to the diagram bellow Winch Door Installation...

Page 13: ...13 1 Install the front door frame and door winch bracket 2 Fix the winch to the bracket Make sure the winch handle faces the outside Refer to Figure 1...

Page 14: ...ection The side with pipe pockets faces inward 4 Connect the door bracing tube 2pcs set with M6x40 bolt 5 Thread the door bracing tube into the pocket from top to bottom Pay attention to the bottom br...

Page 15: ...rame and on the same plane as the pulley and then the steel wire rope sags naturally Keep the length of both sides equal and naturally sag to the ground 7 Fix each end of steel wire rope to the hole o...

Page 16: ...16 9 Adjust the length of the steel wire rope to be equal on both sides Fix the wire rope fold to the hole in the winch Refer to Figure 4 4...

Page 17: ...10 Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about 40 50cm away from the cross beam Lace the eyelets on the cloth to cross beam with a rope Refer to Figur...

Page 18: ...he winch door installation is completed Turn the winch clockwise to raise and counterclockwise to lower the door The steel wire rope shall be evenly wound on the winch so that the door can rise and fa...

Page 19: ...e sure doing not over pull the end of roof cover 2 Pull the roof cover over frame EVENLY CAREFULLY AND SLOWLY Insert tensioning tube No 8 into the pipe pockets Cut a small opening over against every b...

Page 20: ...20 Now your assembly is completed...

Reviews: